← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5023494
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $4,047.00 proposed penalty

  2. Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements.

    violationRecord 5029311
    WELLS PREP PLANT AND LOADOUT · 4605295

    30 CFR 77.216-3(a)(1) · $151.00 proposed penalty

  3. Escapeways; bituminous and lignite mines.

    violationRecord 5028691
    Speed Mine · 4605437

    30 CFR 75.380(d)(7)(iii) · $177.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5028690
    Speed Mine · 4605437

    30 CFR 75.400 · $432.00 proposed penalty

  5. Electric equipment and circuits; overload and short circuit protection; minimum requirements.

    violationRecord 5028689
    Speed Mine · 4605437

    30 CFR 75.518-1 · $209.00 proposed penalty

  6. Identification of circuit breakers.

    violationRecord 5028688
    Speed Mine · 4605437

    30 CFR 75.904 · $193.00 proposed penalty

  7. Electric equipment and circuits; overload and short circuit protection; minimum requirements.

    violationRecord 5028687
    Speed Mine · 4605437

    30 CFR 75.518-1 · $209.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5028686
    Speed Mine · 4605437

    30 CFR 75.400 · $432.00 proposed penalty

  9. Automatic fire warning devices; actions and response.

    violationRecord 5028256
    Speed Mine · 4605437

    30 CFR 75.1103-5(a)(2) · $398.00 proposed penalty

  10. Mechanical equipment guards.

    violationRecord 5028255
    Speed Mine · 4605437

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  11. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5090036
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1731(a) · $151.00 proposed penalty

  12. Loading and haulage equipment; operation.

    violationRecord 5028082
    Glancy Surface Mine · 4609377

    30 CFR 77.1607(b) · Significant and substantial (S&S) · $465.00 proposed penalty

  13. Loading and haulage equipment; operation.

    violationRecord 5021218
    Glancy Surface Mine · 4609377

    30 CFR 77.1607(b) · Significant and substantial (S&S) · $755.00 proposed penalty

  14. Power wires and cables; insulation and protection.

    violationRecord 5025894
    Winchester 2 · 4609615

    30 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  15. Verbal Hazard Complaint Inspections

    inspectionRecord F0058B7
    Speed Mine · 4605437

    5.0 on-site hours reported

  16. Accumulation of combustible materials.

    violationRecord 5084435
    NO. 77 · 1509636

    30 CFR 75.400 · $398.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 5084015
    NO. 77 · 1509636

    30 CFR 75.604(b) · $165.00 proposed penalty

  18. Roof control plan.

    violationRecord 5084014
    NO. 77 · 1509636

    30 CFR 75.220(a)(1) · $226.00 proposed penalty

  19. Electrical connections or splices; suitability.

    violationRecord 5080017
    BEAR BRANCH 2 · 1518565

    30 CFR 75.514 · $226.00 proposed penalty

  20. Electric equipment; examination, testing and maintenance.

    violationRecord 5080016
    BEAR BRANCH 2 · 1518565

    30 CFR 75.512 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  21. Other safeguards.

    violationRecord 5029947
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · Significant and substantial (S&S) · $4,383.00 proposed penalty

  22. Drill dust control at underground areas of underground mines.

    violationRecord 5029946
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 72.630(b) · $267.00 proposed penalty

  23. Machinery and equipment; operation and maintenance.

    violationRecord 5029945
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $883.00 proposed penalty

  24. Escapeways; bituminous and lignite mines.

    violationRecord 5029069
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(7)(vii)(A) · $2,503.00 proposed penalty

  25. Refuge alternatives.

    violationRecord 5029068
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1506(g) · $2,503.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.