← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5027826
    EAGLE #3 MINE · 4609427

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  2. Permanent splicing of trailing cables.

    violationRecord 5027969
    Flying Eagle · 4609471

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  3. Escapeway maps.

    violationRecord 5025900
    Winchester 2 · 4609615

    30 CFR 75.1505(b) · $151.00 proposed penalty

  4. Spot Inspection

    inspectionRecord F015C70
    Samples Surface Mine · 4607178

    1.5 on-site hours reported

  5. Spot Inspections

    inspectionRecord F005856
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 6.0 on-site hours reported

  6. Trailing cables for mobile equipment, ground wires, and ground check wires.

    violationRecord 5080021
    NO. 77 · 1509636

    30 CFR 75.906 · $165.00 proposed penalty

  7. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5081903
    Calvary No 81 · 1512753

    30 CFR 75.1714-3(a) · $151.00 proposed penalty

  8. Loading and haulage equipment; operation.

    violationRecord 5021648
    Sycamore Surface Mine · 4607058

    30 CFR 77.1607(n) · Significant and substantial (S&S) · $818.00 proposed penalty

  9. Electrical connections or splices; suitability.

    violationRecord 5090047
    Coal Clean Prep Plant · 4608571

    30 CFR 77.504 · $151.00 proposed penalty

  10. Cable fittings; suitability.

    violationRecord 5090046
    Coal Clean Prep Plant · 4608571

    30 CFR 77.505 · $151.00 proposed penalty

  11. Mechanical equipment guards.

    violationRecord 5090045
    Coal Clean Prep Plant · 4608571

    30 CFR 77.400(d) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  12. Cable fittings; suitability.

    violationRecord 5090044
    Coal Clean Prep Plant · 4608571

    30 CFR 77.505 · $151.00 proposed penalty

  13. Travelways at surface installations.

    violationRecord 5090043
    Coal Clean Prep Plant · 4608571

    30 CFR 77.205(e) · $151.00 proposed penalty

  14. Accumulations of combustible materials.

    violationRecord 5028394
    Coal Clean Prep Plant · 4608571

    30 CFR 77.1104 · $151.00 proposed penalty

  15. Machinery and equipment; operation and maintenance.

    violationRecord 5028393
    Coal Clean Prep Plant · 4608571

    30 CFR 77.404(a) · $151.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 5025209
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  17. Emergency tethers.

    violationRecord 5020411
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1714-6 · $151.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5020410
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · $398.00 proposed penalty

  19. Mechanical equipment guards.

    violationRecord 5021228
    Flying Eagle · 4609471

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty

  20. Protection from falls of roof, face and ribs.

    violationRecord 5021227
    Flying Eagle · 4609471

    30 CFR 75.202(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty

  21. Other safeguards.

    violationRecord 5025899
    Winchester 2 · 4609615

    30 CFR 75.1403

  22. Verbal Hazard Complaint Inspections

    inspectionRecord F014275
    Maple Eagle No. 1 Mine · 4604236

    13.5 on-site hours reported

  23. Spot Inspections

    inspectionRecord F005855
    Speed Mine · 4605437

    103(i) · 5.0 on-site hours reported

  24. Regular Safety and Health Inspection

    inspectionRecord F015096
    Sycamore Surface Mine · 4607058

    36.0 on-site hours reported

  25. Automatic fire warning devices; actions and response.

    violationRecord 5084269
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1103-5(a) · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.