Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
EAGLE #3 MINE · 460942730 CFR 75.370(a)(1) · $504.00 proposed penalty
Permanent splicing of trailing cables.
Flying Eagle · 460947130 CFR 75.604(b) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Escapeway maps.
Winchester 2 · 460961530 CFR 75.1505(b) · $151.00 proposed penalty
Spot Inspection
Samples Surface Mine · 46071781.5 on-site hours reported
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 6.0 on-site hours reported
Trailing cables for mobile equipment, ground wires, and ground check wires.
NO. 77 · 150963630 CFR 75.906 · $165.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
Calvary No 81 · 151275330 CFR 75.1714-3(a) · $151.00 proposed penalty
Loading and haulage equipment; operation.
Sycamore Surface Mine · 460705830 CFR 77.1607(n) · Significant and substantial (S&S) · $818.00 proposed penalty
Electrical connections or splices; suitability.
Coal Clean Prep Plant · 460857130 CFR 77.504 · $151.00 proposed penalty
Cable fittings; suitability.
Coal Clean Prep Plant · 460857130 CFR 77.505 · $151.00 proposed penalty
Mechanical equipment guards.
Coal Clean Prep Plant · 460857130 CFR 77.400(d) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Cable fittings; suitability.
Coal Clean Prep Plant · 460857130 CFR 77.505 · $151.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(e) · $151.00 proposed penalty
Accumulations of combustible materials.
Coal Clean Prep Plant · 460857130 CFR 77.1104 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Coal Clean Prep Plant · 460857130 CFR 77.404(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $642.00 proposed penalty
Emergency tethers.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1714-6 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester Peerless Rachel Mine · 460925830 CFR 75.202(a) · $398.00 proposed penalty
Mechanical equipment guards.
Flying Eagle · 460947130 CFR 75.1722(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty
Other safeguards.
Winchester 2 · 460961530 CFR 75.1403
Verbal Hazard Complaint Inspections
Maple Eagle No. 1 Mine · 460423613.5 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Regular Safety and Health Inspection
Sycamore Surface Mine · 460705836.0 on-site hours reported
Automatic fire warning devices; actions and response.
BEAR BRANCH 2 · 151856530 CFR 75.1103-5(a) · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.