← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5021230
    Speed Mine · 4605437

    30 CFR 75.400 · $959.00 proposed penalty

  2. Mechanical equipment guards.

    violationRecord 5028281
    Coal Clean Prep Plant · 4608571

    30 CFR 77.400(d) · $151.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F005858
    Speed Mine · 4605437

    103(i) · 6.5 on-site hours reported

  4. Permissible electric face equipment; maintenance.

    violationRecord 5084615
    NO. 77 · 1509636

    30 CFR 75.503 · $226.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 5025213
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,037.00 proposed penalty

  6. Methane monitors.

    violationRecord 5025212
    Speed Mine · 4605437

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  7. Daily inspection of surface coal mine; certified person; reports of inspection.

    violationRecord 5028280
    Coal Clean Prep Plant · 4608571

    30 CFR 77.1713(a) · Significant and substantial (S&S) · $465.00 proposed penalty

  8. Mechanical equipment guards.

    violationRecord 5028279
    Coal Clean Prep Plant · 4608571

    30 CFR 77.400(d) · $151.00 proposed penalty

  9. Mechanical equipment guards.

    violationRecord 5028278
    Coal Clean Prep Plant · 4608571

    30 CFR 77.400(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  10. Mechanical equipment guards.

    violationRecord 5028277
    Coal Clean Prep Plant · 4608571

    30 CFR 77.400(c) · $151.00 proposed penalty

  11. Mechanical equipment guards.

    violationRecord 5028276
    Coal Clean Prep Plant · 4608571

    30 CFR 77.400(d) · $151.00 proposed penalty

  12. Travelways at surface installations.

    violationRecord 5028275
    Coal Clean Prep Plant · 4608571

    30 CFR 77.205(b) · Significant and substantial (S&S) · $313.00 proposed penalty

  13. Disorders (repeated trauma)

    accidentRecord 220260770007
    NORTH EAGLE MINE · 4608759

    Occupatnal illness not deg 1-6

    Accident narrative

    Based on audiometric evidence and review on March 13, 2026, the employee meets the reportable hearing loss threshold under 30 CFR Part 62. The age-corrected Standard Threshold Shift was 25.6 dB in the right ear, exceeding the 25 dB average at 2000, 3000, and 4000 Hz from the employee's baseline/revised baseline audiogram. All 30 CFR Part 62 requirements were followed.

  14. Spot Inspection

    inspectionRecord F015D7E
    Calvary No 81 · 1512753

    9.5 on-site hours reported

  15. Verbal Hazard Complaint Inspections

    inspectionRecord F00BE62
    Winchester Peerless Rachel Mine · 4609258

    3.0 on-site hours reported

  16. Ventilation controls.

    violationRecord 5028692
    Speed Mine · 4605437

    30 CFR 75.333(e)(1)(i) · $177.00 proposed penalty

  17. Protection of trailing cables.

    violationRecord 5020422
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.606 · $313.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F000708
    BEAR BRANCH 2 · 1518565

    103(i) · 5.0 on-site hours reported

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 9840145
    Speed Mine · 4605437

    30 CFR 75.512 · $465.00 proposed penalty

  20. Permanent splicing of trailing cables.

    violationRecord 9840144
    Speed Mine · 4605437

    30 CFR 75.604(b) · $1,037.00 proposed penalty

  21. Roof bolting.

    violationRecord 5020421
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.204(f)(7) · $267.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5025903
    Winchester 2 · 4609615

    30 CFR 75.400 · $151.00 proposed penalty

  23. Handtools (nonpowered)

    accidentRecord 220261280014
    Calvary No 81 · 1512753

    Days away from work only

    Accident narrative

    EE exited EE's carrier to attempt to dislodge a rock form the dolly on the back bridge. EE was pushing down on the slate bar EE was using to dislodge the rock and felt pain in EE's left shoulder. EE has continued to work until 05/07/2026 when EE was taken off work.

  24. Fall of roof or back

    accidentRecord 220261280005
    Flying Eagle · 4609471

    Accident only

    Accident narrative

    As the airway examiner was examine the weekly intake airway a small 10'x10' roof fall that pulled 4 roof bolts was found just inby the fan house, the lifeline was rerouted to another entry, we submitted a plan to clean and rebolt the area that has been completed.

  25. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F01427B
    Maple Eagle No. 1 Mine · 4604236

    3.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.