Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Compressed air systems.
Samples Surface Mine · 460717830 CFR 77.412(a) · $165.00 proposed penalty
Cable fittings; suitability.
EAGLE #3 MINE · 460942730 CFR 75.515 · $245.00 proposed penalty
Accumulation of combustible materials.
EAGLE #3 MINE · 460942730 CFR 75.400 · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
EAGLE #3 MINE · 460942730 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Mine ventilation plan; submission and approval.
EAGLE #3 MINE · 460942730 CFR 75.370(a)(1) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
NO. 77 · 150963630 CFR 75.403 · $165.00 proposed penalty
Daily examination of hoisting equipment.
Speed Mine · 460543730 CFR 75.1400-3(b)(3) · $4,749.00 proposed penalty
Permanent splicing of trailing cables.
Speed Mine · 460543730 CFR 75.604(b) · Significant and substantial (S&S) · $12,403.00 proposed penalty
Power wires and cables; insulation and protection.
Speed Mine · 460543730 CFR 75.517 · Significant and substantial (S&S) · $10,569.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $226.00 proposed penalty
Permissible electric face equipment; maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.503 · $1,818.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $226.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
NORTH EAGLE MINE · 460875930 CFR 75.1714-3(d) · $151.00 proposed penalty
Dust accumulations in surface installations.
No. 76 Plant · 151652030 CFR 77.202 · $151.00 proposed penalty
Travelways at surface installations.
No. 76 Plant · 151652030 CFR 77.205(e) · $151.00 proposed penalty
Travelways at surface installations.
No. 76 Plant · 151652030 CFR 77.205(a) · $151.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection; minimum requirements.
Winchester 2 · 460961530 CFR 75.518-1 · $151.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 6.0 on-site hours reported
Permissible exposure level.
NO. 77 · 150963630 CFR 62.130(b) · $245.00 proposed penalty
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · $432.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
NO. 77 · 150963630 CFR 75.1731(a) · $209.00 proposed penalty
Quantity and location of firefighting equipment.
Calvary No 81 · 151275330 CFR 75.1100-2(f) · $151.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
COAL BRANCH NO. 2 · 460966330 CFR 75.1107-4(c) · $165.00 proposed penalty
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 3.5 on-site hours reported
Mechanical equipment guards.
Calvary No 81 · 151275330 CFR 75.1722(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.