← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5084302
    NO. 77 · 1509636

    30 CFR 75.1731(b) · $209.00 proposed penalty

  2. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5084301
    NO. 77 · 1509636

    30 CFR 75.1731(a) · $288.00 proposed penalty

  3. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 5084300
    NO. 77 · 1509636

    30 CFR 75.1101-8(b) · $209.00 proposed penalty

  4. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9778803
    BEAR BRANCH 2 · 1518565

    30 CFR 77.1606(c) · $151.00 proposed penalty

  5. Machinery

    accidentRecord 220261590003
    Winchester Peerless Rachel Mine · 4609258

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was roof bolting in #2 Entry when a rock dislodged from the mine roof while drilling, struck EE's hand, and caught EE's left ring finger between the rock and drill pot. Employee was evaluated at Boone Memorial, diagnosed with a fracture, and returned to work 6/4/2026 with no restrictions. No Days Lost

  6. Spot Inspections

    inspectionRecord F00705A
    Speed Mine · 4605437

    103(i) · 6.0 on-site hours reported

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 5084299
    NO. 77 · 1509636

    30 CFR 75.512 · $366.00 proposed penalty

  8. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 9778802
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1106-3(a)(2) · $336.00 proposed penalty

  9. Travelways at surface installations.

    violationRecord 5028321
    South Hollow Prep Plant and Loadout · 4603085

    30 CFR 77.205(a) · $177.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5023000
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $883.00 proposed penalty

  11. Weekly examination.

    violationRecord 5028113
    NORTH EAGLE MINE · 4608759

    30 CFR 75.364(b)(2) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  12. Methane monitors.

    violationRecord 5028029
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.342(a)(4) · $245.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 5028028
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.604(b) · $549.00 proposed penalty

  14. Roof control plan.

    violationRecord 5028700
    Winchester 2 · 4609615

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F022D72
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 7.5 on-site hours reported

  16. Mechanical equipment guards.

    violationRecord 5084298
    NO. 77 · 1509636

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $465.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5084297
    NO. 77 · 1509636

    30 CFR 75.400 · $592.00 proposed penalty

  18. Dust accumulations in surface installations.

    violationRecord 5028320
    South Hollow Prep Plant and Loadout · 4603085

    30 CFR 77.202 · $151.00 proposed penalty

  19. Electric wiring and equipment; installation and maintenance.

    violationRecord 5028319
    South Hollow Prep Plant and Loadout · 4603085

    30 CFR 77.516 · $177.00 proposed penalty

  20. Travelways at surface installations.

    violationRecord 5028318
    South Hollow Prep Plant and Loadout · 4603085

    30 CFR 77.205(a) · Significant and substantial (S&S) · $267.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 9554311
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.202(a) · Significant and substantial (S&S) · $17,082.00 proposed penalty

  22. Violation — cited standard not reported

    violationRecord 9554310
    Maple Eagle No. 1 Mine · 4604236
  23. Quantity and location of firefighting equipment.

    violationRecord 5021822
    Speed Mine · 4605437

    30 CFR 75.1100-2(b) · $398.00 proposed penalty

  24. Other safeguards.

    violationRecord 5021821
    Speed Mine · 4605437

    30 CFR 75.1403 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  25. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 5028112
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1107-7(b) · $165.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.