  1. Accumulation of combustible materials.

    violationRecord 5021832
    Speed Mine · 4605437

    30 CFR 75.400 · $1,679.00 proposed penalty

  2. Permanent splicing of trailing cables.

    violationRecord 5021831
    Speed Mine · 4605437

    30 CFR 75.604(b) · Significant and substantial (S&S) · $14,557.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 5020466
    Speed Mine · 4605437

    30 CFR 75.503 · $883.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5020465
    Speed Mine · 4605437

    30 CFR 75.503 · $883.00 proposed penalty

  5. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5026749
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.1606(c) · $151.00 proposed penalty

  6. Loading and haulage equipment; installations.

    violationRecord 5026748
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.1605(d) · $151.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5021249
    NORTH EAGLE MINE · 4608759

    30 CFR 75.333(c)(3) · $165.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5021248
    NORTH EAGLE MINE · 4608759

    30 CFR 75.400 · $267.00 proposed penalty

  9. Permanent splicing of trailing cables.

    violationRecord 5186368
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.604(b) · $697.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5183747
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.503 · $151.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5183746
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.400 · $151.00 proposed penalty

  12. Drill dust control at underground areas of underground mines.

    violationRecord 5183745
    Maple Eagle East Deep Mine · 4609416

    30 CFR 72.630(b) · $151.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5183744
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.400 · $151.00 proposed penalty

  14. Permissible electric face equipment; maintenance.

    violationRecord 5183743
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.503 · $151.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5183742
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 5180047
    EAGLE #3 MINE · 4609427

    30 CFR 75.517 · Significant and substantial (S&S) · $366.00 proposed penalty

  17. Ventilation controls.

    violationRecord 5081930
    Calvary No 81 · 1512753

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  18. Ventilation controls.

    violationRecord 5081929
    Calvary No 81 · 1512753

    30 CFR 75.333(b)(3) · $151.00 proposed penalty

  19. Surface installations; general.

    violationRecord 5028342
    South Hollow Prep Plant and Loadout · 4603085

    30 CFR 77.200 · $151.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5020464
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $959.00 proposed penalty

  21. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5026747
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.1606(c) · $151.00 proposed penalty

  22. Condition and examination of firefighting equipment.

    violationRecord 5186367
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1100-3 · $313.00 proposed penalty

  23. Permissible electric face equipment; maintenance.

    violationRecord 5186366
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.503 · $245.00 proposed penalty

  24. Ventilation controls.

    violationRecord 5180046
    EAGLE #3 MINE · 4609427

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 5180045
    EAGLE #3 MINE · 4609427

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.