Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine map.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.1200(h) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Clamping of trailing cables to equipment.
EAGLE #3 MINE · 460942730 CFR 75.605 · $245.00 proposed penalty
Permanent splicing of trailing cables.
EAGLE #3 MINE · 460942730 CFR 75.604(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Flying Eagle · 460947130 CFR 75.1731(b) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
NO. 77 · 150963630 CFR 75.1731(a) · $267.00 proposed penalty
Ventilation controls.
Calvary No 81 · 151275330 CFR 75.333(b)(2) · $151.00 proposed penalty
Automatic fire warning devices; actions and response.
Calvary No 81 · 151275330 CFR 75.1103-5(h) · $151.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
BEAR BRANCH 2 · 151856530 CFR 75.701 · $313.00 proposed penalty
Communications facilities; refuge alternatives.
BEAR BRANCH 2 · 151856530 CFR 75.1600-3(a) · $313.00 proposed penalty
Mechanical equipment guards.
BEAR BRANCH 2 · 151856530 CFR 75.1722(a) · $432.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $883.00 proposed penalty
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $1,219.00 proposed penalty
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $1,219.00 proposed penalty
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $1,219.00 proposed penalty
Quarterly sampling; designated areas.
Maple Eagle No. 1 Mine · 460423630 CFR 70.209(a) · $366.00 proposed penalty
Quarterly sampling; designated areas.
Maple Eagle No. 1 Mine · 460423630 CFR 70.209(a) · $366.00 proposed penalty
Examination and maintenance of firefighting equipment.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.1110 · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.1110 · $151.00 proposed penalty
Loading and haulage equipment; installations.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.1605(d) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester Peerless Rachel Mine · 460925830 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Glancy Surface Mine · 460937730 CFR 77.1606(c) · $209.00 proposed penalty
Travelways at surface installations.
Glancy Surface Mine · 460937730 CFR 77.205(e) · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.