← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Verbal Hazard Complaint Inspections

    inspectionRecord F007063
    Speed Mine · 4605437

    5.5 on-site hours reported

  2. Mine ventilation plan; submission and approval.

    violationRecord 9849770
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $1,320.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5020472
    Speed Mine · 4605437

    30 CFR 75.604(b) · Significant and substantial (S&S) · $12,403.00 proposed penalty

  4. Drill dust control at underground areas of underground mines.

    violationRecord 5023590
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 72.630(b) · $165.00 proposed penalty

  5. Roof bolting.

    violationRecord 5023589
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.204(g) · $151.00 proposed penalty

  6. Drill dust control at underground areas of underground mines.

    violationRecord 5024181
    COAL BRANCH NO. 2 · 4609663

    30 CFR 72.630(b) · $267.00 proposed penalty

  7. Machinery and equipment; operation and maintenance.

    violationRecord 5024180
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 5081933
    Calvary No 81 · 1512753

    30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5081932
    Calvary No 81 · 1512753

    30 CFR 75.400 · $151.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029871
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(a) · $465.00 proposed penalty

  11. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029870
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(a) · $465.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5021839
    Speed Mine · 4605437

    30 CFR 75.503 · $1,126.00 proposed penalty

  13. Mechanical equipment guards.

    violationRecord 5028353
    Rocklick Preparation Plant · 4606448

    30 CFR 77.400(d) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  14. Mechanical equipment guards.

    violationRecord 5028352
    Rocklick Preparation Plant · 4606448

    30 CFR 77.400(d) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  15. Dust accumulations in surface installations.

    violationRecord 5028351
    Rocklick Preparation Plant · 4606448

    30 CFR 77.202 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  16. Ladders; construction; installation and maintenance.

    violationRecord 5028350
    Rocklick Preparation Plant · 4606448

    30 CFR 77.206(a) · $193.00 proposed penalty

  17. Travelways at surface installations.

    violationRecord 5028349
    Rocklick Preparation Plant · 4606448

    30 CFR 77.205(a) · $465.00 proposed penalty

  18. Dust accumulations in surface installations.

    violationRecord 5028348
    Rocklick Preparation Plant · 4606448

    30 CFR 77.202 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  19. Other safeguards.

    violationRecord 5028057
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1403 · $193.00 proposed penalty

  20. Other safeguards.

    violationRecord 5028056
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1403 · $432.00 proposed penalty

  21. On-shift examination.

    violationRecord 5020471
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.362(a)(1) · Significant and substantial (S&S) · $7,676.00 proposed penalty

  22. Escapeways; bituminous and lignite mines.

    violationRecord 5020470
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $17,082.00 proposed penalty

  23. Mechanical equipment guards.

    violationRecord 5020469
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty

  24. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 5020468
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1101-8(a) · $1,037.00 proposed penalty

  25. Temporary notations, revisions, and supplements.

    violationRecord 5020467
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.1202 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.