Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Ventilation controls.
NORTH EAGLE MINE · 460875930 CFR 75.333(c)(3) · $151.00 proposed penalty
Preshift examination at fixed intervals.
NORTH EAGLE MINE · 460875930 CFR 75.360(f) · $165.00 proposed penalty
Drill dust control at underground areas of underground mines.
Winchester Peerless Rachel Mine · 460925830 CFR 72.630(b) · $245.00 proposed penalty
Other safeguards.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1403 · Significant and substantial (S&S) · $959.00 proposed penalty
Roof control plan.
Winchester Peerless Rachel Mine · 460925830 CFR 75.220(a)(1) · $1,968.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $818.00 proposed penalty
Self-rescue devices; use and location requirements.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1714-2(c) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Mine ventilation plan; submission and approval.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.370(a)(1) · $336.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.512 · $177.00 proposed penalty
Other safeguards.
EAGLE #3 MINE · 460942730 CFR 75.1403 · $177.00 proposed penalty
Water sprinkler systems; general.
Flying Eagle · 460947130 CFR 75.1101-6 · $245.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $549.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Flying Eagle · 460947130 CFR 75.1731(b) · $245.00 proposed penalty
Cable fittings; suitability.
Flying Eagle · 460947130 CFR 75.515 · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Flying Eagle · 460947130 CFR 75.1731(a) · $366.00 proposed penalty
Communications facilities; refuge alternatives.
Flying Eagle · 460947130 CFR 75.1600-3(a)(1) · $245.00 proposed penalty
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 5.5 on-site hours reported
Spot Inspection
SHM-44 · 15189788.8 on-site hours reported
Permanent splicing of trailing cables.
Speed Mine · 460543730 CFR 75.604(b) · $2,503.00 proposed penalty
Spot Inspections
NO. 77 · 1509636103(i) · 5.5 on-site hours reported
Methane monitors.
NO. 77 · 150963630 CFR 75.342(a)(4) · $226.00 proposed penalty
Drill dust control at underground areas of underground mines.
Calvary No 81 · 151275330 CFR 72.630(b) · $177.00 proposed penalty
Mine ventilation plan; submission and approval.
Calvary No 81 · 151275330 CFR 75.370(a)(1) · $177.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
BEAR BRANCH 2 · 151856530 CFR 75.1911(i) · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.