← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-11-07Database snapshot · 2026-11-07

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 9779833
    NO. 77 · 1509636

    30 CFR 75.512 · $177.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 7558653
    NO. 77 · 1509636

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  3. Drill dust control at underground areas of underground mines.

    violationRecord 7558652
    NO. 77 · 1509636

    30 CFR 72.630(b) · Significant and substantial (S&S) · $465.00 proposed penalty

  4. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9776325
    Calvary No 81 · 1512753

    30 CFR 75.1731(b) · $151.00 proposed penalty

  5. Condition and examination of firefighting equipment.

    violationRecord 9776324
    Calvary No 81 · 1512753

    30 CFR 75.1100-3 · $151.00 proposed penalty

  6. Smoking programs.

    violationRecord 9776269
    Calvary No 81 · 1512753

    30 CFR 75.1702-1 · $151.00 proposed penalty

  7. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 9776268
    Calvary No 81 · 1512753

    30 CFR 75.1103-8(c) · $151.00 proposed penalty

  8. Air quality detectors and measurement devices.

    violationRecord 9777412
    BEAR BRANCH 2 · 1518565

    30 CFR 75.320(a) · $226.00 proposed penalty

  9. Ventilation controls.

    violationRecord 9841392
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(d)(1) · $151.00 proposed penalty

  10. Quantity and location of firefighting equipment.

    violationRecord 9841391
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1100-2(f) · $226.00 proposed penalty

  11. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 9841390
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  12. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9841389
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1107-9(b) · $151.00 proposed penalty

  13. Power wires and cables; insulation and protection.

    violationRecord 5023930
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.517 · $1,219.00 proposed penalty

  14. Inspection of fire suppression devices.

    violationRecord 5023929
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  15. Cable fittings; suitability.

    violationRecord 9849091
    Speed Mine · 4605437

    30 CFR 75.515 · $366.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 9848970
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 9848969
    Speed Mine · 4605437

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  18. Clamping of trailing cables to equipment.

    violationRecord 5023549
    Speed Mine · 4605437

    30 CFR 75.605 · $151.00 proposed penalty

  19. Short circuit protection of trailing cables.

    violationRecord 5023548
    Speed Mine · 4605437

    30 CFR 75.601 · $151.00 proposed penalty

  20. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5023547
    Speed Mine · 4605437

    30 CFR 75.601-1 · $151.00 proposed penalty

  21. Electric equipment; examination, testing, and maintenance.

    violationRecord 9849294
    Rocklick Preparation Plant · 4606448

    30 CFR 77.502 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  22. Mechanical equipment guards.

    violationRecord 9849293
    Rocklick Preparation Plant · 4606448

    30 CFR 77.400(c) · $2,936.00 proposed penalty

  23. Roof bolting.

    violationRecord 9843194
    NORTH EAGLE MINE · 4608759

    30 CFR 75.204(c)(1) · $267.00 proposed penalty

  24. Machinery and equipment; operation and maintenance.

    violationRecord 9843193
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1725(a) · $398.00 proposed penalty

  25. Slip or fall of person

    accidentRecord 220251110002
    NORTH EAGLE MINE · 4608759

    No dys awy frm wrk,no rstr act

    Accident narrative

    EE rolled left ankle while dismounting the Co. #402 roof bolting machine in the #5 entry due to an unseen 4"x4" hole in the mine floor. EE reported the incident later in the shift and continued working. That night they sought medical attention and was diagnosed with a sprained ankle. EE was fully released to work on 02/12/2025.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.