← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-11-07Database snapshot · 2026-11-07

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 9774875
    NO. 77 · 1509636

    30 CFR 75.512 · $177.00 proposed penalty

  2. Travelways at surface installations.

    violationRecord 5025033
    Coon Hollow Tunnel Mine · 4609099

    30 CFR 77.205(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  3. Automatic fire sensors.

    violationRecord 5090107
    Flying Eagle · 4609471

    30 CFR 75.1103-1(b) · $151.00 proposed penalty

  4. Non-Injury Accident Investigation

    inspectionRecord F000352
    BEAR BRANCH 2 · 1518565

    20.0 on-site hours reported

  5. Violation — cited standard not reported

    violationRecord 9777417
    BEAR BRANCH 2 · 1518565
  6. Temporary notations, revisions, and supplements.

    violationRecord 9841395
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1202-1(b)(3) · $151.00 proposed penalty

  7. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9841394
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(a) · $151.00 proposed penalty

  8. Escapeways; bituminous and lignite mines.

    violationRecord 5023937
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(1) · $4,383.00 proposed penalty

  9. Other safeguards.

    violationRecord 5023936
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $818.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5023935
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $465.00 proposed penalty

  11. Permanent splicing of trailing cables.

    violationRecord 5025032
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.604(b) · $432.00 proposed penalty

  12. Actions for excessive methane.

    violationRecord 5090106
    Flying Eagle · 4609471

    30 CFR 75.323(a) · $1,037.00 proposed penalty

  13. Roof control plan.

    violationRecord 5090105
    Flying Eagle · 4609471

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  14. Rock dusting.

    violationRecord 5090104
    Flying Eagle · 4609471

    30 CFR 75.402 · $267.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5090103
    Flying Eagle · 4609471

    30 CFR 75.400 · $504.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F004C56
    NO. 77 · 1509636

    103(i) · 8.0 on-site hours reported

  17. Spot Inspections

    inspectionRecord F004C8D
    BEAR BRANCH 2 · 1518565

    103(i) · 8.0 on-site hours reported

  18. Non-Injury Accident Investigation

    inspectionRecord F000351
    East Mac & Nellie · 1518966

    2.8 on-site hours reported

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 9777184
    NO. 77 · 1509636

    30 CFR 75.512 · $177.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 9777183
    NO. 77 · 1509636

    30 CFR 75.400 · $245.00 proposed penalty

  21. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9774874
    NO. 77 · 1509636

    30 CFR 75.1731(b) · $151.00 proposed penalty

  22. Violation — cited standard not reported

    violationRecord 9777416
    East Mac & Nellie · 1518966
  23. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9841393
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1107-9(b) · $151.00 proposed penalty

  24. Preshift examination at fixed intervals.

    violationRecord 5025031
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.360(d) · $755.00 proposed penalty

  25. Refuge alternatives.

    violationRecord 5025030
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1506(h)(1) · $755.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.