  1. Violation — cited standard not reported

    violationRecord 9841365
    Blue Creek No. 1 UG Mine · 4609297
  2. Mine ventilation plan; submission and approval.

    violationRecord 9848912
    EAGLE #3 MINE · 4609427

    30 CFR 75.370(a)(1) · $1,679.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 9848911
    EAGLE #3 MINE · 4609427

    30 CFR 75.370(a)(1) · $3,736.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 9848910
    EAGLE #3 MINE · 4609427

    30 CFR 75.503 · $1,431.00 proposed penalty

  5. Non-Injury Accident Investigation

    inspectionRecord 6321980
    Blue Creek No. 1 UG Mine · 4609297

    6.8 on-site hours reported

  6. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 9777223
    NO. 77 · 1509636

    30 CFR 75.1103-4(a)(1)(iii) · $151.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 9777222
    NO. 77 · 1509636

    30 CFR 75.400 · $226.00 proposed penalty

  8. Preshift examination at fixed intervals.

    violationRecord 8223278
    Calvary No 81 · 1512753

    30 CFR 75.360(b)(11)(iii) · $151.00 proposed penalty

  9. Rock dusting.

    violationRecord 8223277
    Calvary No 81 · 1512753

    30 CFR 75.402 · $151.00 proposed penalty

  10. Communication wires and cables; installation; insulation; support.

    violationRecord 8223276
    Calvary No 81 · 1512753

    30 CFR 75.516-2(c) · $151.00 proposed penalty

  11. Permissible exposure level.

    violationRecord 9779755
    BEAR BRANCH 2 · 1518565

    30 CFR 62.130(a) · $267.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 9777286
    BEAR BRANCH 2 · 1518565

    30 CFR 75.503 · $313.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 9777285
    BEAR BRANCH 2 · 1518565

    30 CFR 75.604(b) · $209.00 proposed penalty

  14. Diesel-powered equipment intended for use in underground coal mines.

    violationRecord 9777284
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1907(b)(3) · $177.00 proposed penalty

  15. Electric equipment and circuits; overload and short circuit protection; minimum requirements.

    violationRecord 9849664
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.518-1 · $267.00 proposed penalty

  16. Permanent splicing of trailing cables.

    violationRecord 9848959
    Speed Mine · 4605437

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  17. Power wires and cables; insulation and protection.

    violationRecord 9848958
    Speed Mine · 4605437

    30 CFR 75.517 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  18. Roof control plan.

    violationRecord 9848957
    Speed Mine · 4605437

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  19. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 9843186
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1106-3(a)(2) · $209.00 proposed penalty

  20. Communication wires and cables; installation; insulation; support.

    violationRecord 9843185
    NORTH EAGLE MINE · 4608759

    30 CFR 75.516-2(a) · $151.00 proposed penalty

  21. Other safeguards.

    violationRecord 9843184
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1403 · $366.00 proposed penalty

  22. Power wires and cables; insulation and protection.

    violationRecord 9848606
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  23. Low-, medium-, or high-voltage distribution circuits and equipment; repair.

    violationRecord 9848605
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.511 · $959.00 proposed penalty

  24. Escapeways; bituminous and lignite mines.

    violationRecord 9848604
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.380(d)(1) · $959.00 proposed penalty

  25. Quantity and location of firefighting equipment.

    violationRecord 9847918
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1100-2(f) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.