← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-11-07Database snapshot · 2026-11-07

Safety activity

  1. Spot Inspection

    inspectionRecord 6321850
    Kopperston Tunnel · 4608529

    2.0 on-site hours reported

  2. Spot Inspection

    inspectionRecord 6320134
    Winchester Peerless Rachel Mine · 4609258

    4.5 on-site hours reported

  3. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9778706
    East Mac & Nellie · 1518966

    30 CFR 77.1606(c) · $151.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 9849115
    Speed Mine · 4605437

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 9849114
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  6. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5020326
    Glancy Surface Mine · 4609377

    30 CFR 77.1606(c) · $398.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F008DEE
    BEAR BRANCH 2 · 1518565

    103(i) · 7.5 on-site hours reported

  8. Electrical Technical Investigation

    inspectionRecord F006F03
    Blue Creek No. 1 UG Mine · 4609297

    11.0 on-site hours reported

  9. Violation — cited standard not reported

    violationRecord 9849113
    Speed Mine · 4605437

    $151.00 proposed penalty

  10. Maintenance of incombustible content of rock dust.

    violationRecord 9848514
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.403 · $226.00 proposed penalty

  11. Maintenance of incombustible content of rock dust.

    violationRecord 9848513
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.403 · $226.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 9846436
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  13. Inspection of fire suppression devices.

    violationRecord 5024356
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1107-16(b) · $432.00 proposed penalty

  14. Electric equipment and circuits; overload and short circuit protection.

    violationRecord 5024355
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.518 · $432.00 proposed penalty

  15. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5025336
    Glancy Surface Mine · 4609377

    30 CFR 77.1606(c) · $883.00 proposed penalty

  16. Bathing facilities; change rooms; sanitary flush toilet facilities.

    violationRecord 5025335
    Glancy Surface Mine · 4609377

    30 CFR 71.400 · $267.00 proposed penalty

  17. Machinery and equipment; operation and maintenance.

    violationRecord 5025334
    Coal Branch No.1 Mine · 4609588

    30 CFR 77.404(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  18. Accumulations of combustible materials.

    violationRecord 5025333
    Coal Branch No.1 Mine · 4609588

    30 CFR 77.1104 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  19. Machinery

    accidentRecord 220250920001
    Blue Creek Prep Plant · 4609226

    No dys awy frm wrk,no rstr act

    Accident narrative

    After notching a tree to be cut, EE started boring into the tree and the saw kicked back and ran through EE's chaps and into EE's leg.

  20. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F000642
    BEAR BRANCH 2 · 1518565

    5.0 on-site hours reported

  21. Verbal Hazard Complaint Inspections

    inspectionRecord 6319291
    Maple Eagle No. 1 Mine · 4604236

    7.0 on-site hours reported

  22. Accumulation of combustible materials.

    violationRecord 9774883
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $465.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5025231
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5025230
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  25. Loading and haulage equipment; operation.

    violationRecord 9849006
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.1607(cc) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.