← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9774874
    NO. 77 · 1509636

    30 CFR 75.1731(b) · $151.00 proposed penalty

  2. Violation — cited standard not reported

    violationRecord 9777416
    East Mac & Nellie · 1518966
  3. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9841393
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1107-9(b) · $151.00 proposed penalty

  4. Preshift examination at fixed intervals.

    violationRecord 5025031
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.360(d) · $755.00 proposed penalty

  5. Refuge alternatives.

    violationRecord 5025030
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1506(h)(1) · $755.00 proposed penalty

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5025029
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(7)(vii)(B) · $755.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5023934
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(h) · $165.00 proposed penalty

  8. Underground electrical installations.

    violationRecord 5023933
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.340(a) · $151.00 proposed penalty

  9. Escapeways; bituminous and lignite mines.

    violationRecord 5023932
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(7)(vii)(A) · $883.00 proposed penalty

  10. Quantity and location of firefighting equipment.

    violationRecord 5023931
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1100-2(f) · $151.00 proposed penalty

  11. Machinery and equipment; operation and maintenance.

    violationRecord 9849103
    Speed Mine · 4605437

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9849102
    Speed Mine · 4605437

    30 CFR 75.400 · $209.00 proposed penalty

  13. Drill dust control at underground areas of underground mines.

    violationRecord 9849101
    Speed Mine · 4605437

    30 CFR 72.630(b) · $165.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 9847379
    NORTH EAGLE MINE · 4608759

    30 CFR 75.400 · $336.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 9847378
    NORTH EAGLE MINE · 4608759

    30 CFR 75.400 · $336.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5090102
    Flying Eagle · 4609471

    30 CFR 75.400 · $267.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5090101
    Flying Eagle · 4609471

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5090100
    Flying Eagle · 4609471

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  19. Additional self-contained self-rescuers (SCSRs).

    violationRecord 9843195
    COAL BRANCH NO. 2 · 4609663

    30 CFR 75.1714-4(e) · $151.00 proposed penalty

  20. Fall of face/rib/pillar/side/highwall

    accidentRecord 220251500001
    Maple Eagle No. 1 Mine · 4604236

    Days away from work only

    Accident narrative

    EE was struck by a rib roll in the right foot while setting over in cut with EE's continuous miner. EE did not initially seek medical treatment for EE's injury. EE reported a sharp pain on 5/17/2025 and sought medical treatment at that time. EE was diagnosed with an Achilles Tendon rupture on 5/28/2025 and placed off work at that time.

  21. Quantity and location of firefighting equipment.

    violationRecord 9777232
    NO. 77 · 1509636

    30 CFR 77.1109(c)(1) · $151.00 proposed penalty

  22. Clamping of trailing cables to equipment.

    violationRecord 9774873
    NO. 77 · 1509636

    30 CFR 75.605 · $504.00 proposed penalty

  23. Permissible electric face equipment; maintenance.

    violationRecord 9777182
    BEAR BRANCH 2 · 1518565

    30 CFR 75.503 · $398.00 proposed penalty

  24. Emergency tethers.

    violationRecord 9777181
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1714-6 · $226.00 proposed penalty

  25. Permanent splicing of trailing cables.

    violationRecord 9849100
    Speed Mine · 4605437

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.