Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Loading and haulage equipment; installations.
Glancy Surface Mine · 460937730 CFR 77.1605(d) · $165.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester 2 · 460961530 CFR 75.370(a)(1) · $1,126.00 proposed penalty
Preshift examination at fixed intervals.
Winchester 2 · 460961530 CFR 75.360(f) · $177.00 proposed penalty
Fall of roof or back
NORTH EAGLE MINE · 4608759Accident only
Accident narrative
An unintentional roof fall was discovered on 10 North Mains, Primary Escapeway (Intake) #4 Entry, #4 Break, spad # 10693. Crew was pulled outby affected area, area is being dangered off, and the lifeline is being re-routed. MSHA and WVMHST Officials have been notified. No injuries or entrapments have occurred.
Regular Safety and Health Inspection
Sycamore Surface Mine · 460705874.3 on-site hours reported
Spot Inspection
Flying Eagle · 460947113.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.512 · $755.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1106-3(a)(2) · $504.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
Speed Mine · 460543730 CFR 75.1103-4(e) · $177.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
Speed Mine · 460543730 CFR 75.1103-8(c) · $177.00 proposed penalty
Protection from falls of roof, face and ribs.
Speed Mine · 460543730 CFR 75.202(a) · $755.00 proposed penalty
Explosives; magazines.
Sycamore Surface Mine · 460705830 CFR 77.1301(c)(9) · $1,219.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Sycamore Surface Mine · 460705830 CFR 77.1606(c) · $177.00 proposed penalty
Loading and haulage equipment; installations.
Sycamore Surface Mine · 460705830 CFR 77.1605(a) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $366.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $549.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $1,550.00 proposed penalty
Escapeways; bituminous and lignite mines.
NORTH EAGLE MINE · 460875930 CFR 75.380(d)(7)(i) · $549.00 proposed penalty
Drill dust control at underground areas of underground mines.
Winchester Peerless Rachel Mine · 460925830 CFR 72.630(b) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Permissible electric face equipment; maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.503 · $755.00 proposed penalty
Permanent splicing of trailing cables.
Winchester Peerless Rachel Mine · 460925830 CFR 75.604(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Fall of roof or back
NORTH EAGLE MINE · 4608759Accident only
Accident narrative
An unintentional roof fall was discovered on 9 North Mains in the Primary Escapeway (Intake), #3 and #4 Entries, from Brk #37 to Brk #38. The fall is approximately 20 ft. thick. All affected personnel were removed outby the fall, except those required to perform support work. No injuries or entrapments occurred. MSHA and WVMHST Officials were notified and are currently on-site.
Non-Injury Accident Investigation
NORTH EAGLE MINE · 460875912.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.