← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5091045
    Flying Eagle · 4609471

    30 CFR 75.370(a)(1) · $3,736.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5091044
    Flying Eagle · 4609471

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5091043
    Flying Eagle · 4609471

    30 CFR 75.400 · $697.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5091042
    Flying Eagle · 4609471

    30 CFR 75.400 · $697.00 proposed penalty

  5. Violation — cited standard not reported

    violationRecord 9847563
    Winchester 2 · 4609615
  6. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F00E4B8
    NORTH EAGLE MINE · 4608759

    4.0 on-site hours reported

  7. Mine ventilation plan; submission and approval.

    violationRecord 7558664
    Calvary No 81 · 1512753

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  8. On-shift examination.

    violationRecord 9778714
    BEAR BRANCH 2 · 1518565

    30 CFR 75.362(d)(1)(iii) · $226.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9778659
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $465.00 proposed penalty

  10. Criteria—Belt conveyors.

    violationRecord 9778658
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1403-5(g) · $226.00 proposed penalty

  11. Drill dust control at underground areas of underground mines.

    violationRecord 9841078
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 72.630(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  12. Permanent splicing of trailing cables.

    violationRecord 5025049
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.604(b) · $432.00 proposed penalty

  13. Permissible electric face equipment; maintenance.

    violationRecord 5025048
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.503 · $151.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5025047
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5023969
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  16. Independent contractor register.

    violationRecord 5025343
    WELLS PREP PLANT AND LOADOUT · 4605295

    30 CFR 45.4(b) · $151.00 proposed penalty

  17. Mobile equipment; automatic warning devices.

    violationRecord 5025342
    WELLS PREP PLANT AND LOADOUT · 4605295

    30 CFR 77.410(a) · $151.00 proposed penalty

  18. Machinery and equipment; operation and maintenance.

    violationRecord 9847392
    Speed Mine · 4605437

    30 CFR 75.1725(a) · $313.00 proposed penalty

  19. Highwalls, pits and spoil banks; plans.

    violationRecord 9846717
    Samples Surface Mine · 4607178

    30 CFR 77.1000 · $267.00 proposed penalty

  20. Examination and maintenance of firefighting equipment.

    violationRecord 9846716
    Samples Surface Mine · 4607178

    30 CFR 77.1110 · $465.00 proposed penalty

  21. Drill dust control at underground areas of underground mines.

    violationRecord 5023553
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 72.630(b) · $151.00 proposed penalty

  22. Escapeways; bituminous and lignite mines.

    violationRecord 5023552
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5024263
    EAGLE #3 MINE · 4609427

    30 CFR 75.202(a) · $959.00 proposed penalty

  24. Escapeways; bituminous and lignite mines.

    violationRecord 5024262
    EAGLE #3 MINE · 4609427

    30 CFR 75.380(d)(1) · $398.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 5024261
    EAGLE #3 MINE · 4609427

    30 CFR 75.380(d)(7)(i) · $1,431.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.