Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $3,736.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $504.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $697.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $697.00 proposed penalty
Violation — cited standard not reported
Winchester 2 · 4609615103 (g) Written Notification Hazard Complaint Inspectio
NORTH EAGLE MINE · 46087594.0 on-site hours reported
Mine ventilation plan; submission and approval.
Calvary No 81 · 151275330 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty
On-shift examination.
BEAR BRANCH 2 · 151856530 CFR 75.362(d)(1)(iii) · $226.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Criteria—Belt conveyors.
BEAR BRANCH 2 · 151856530 CFR 75.1403-5(g) · $226.00 proposed penalty
Drill dust control at underground areas of underground mines.
Maple Eagle No. 1 Mine · 460423630 CFR 72.630(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Permanent splicing of trailing cables.
Maple Eagle No. 1 Mine · 460423630 CFR 75.604(b) · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $288.00 proposed penalty
Independent contractor register.
WELLS PREP PLANT AND LOADOUT · 460529530 CFR 45.4(b) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
WELLS PREP PLANT AND LOADOUT · 460529530 CFR 77.410(a) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Speed Mine · 460543730 CFR 75.1725(a) · $313.00 proposed penalty
Highwalls, pits and spoil banks; plans.
Samples Surface Mine · 460717830 CFR 77.1000 · $267.00 proposed penalty
Examination and maintenance of firefighting equipment.
Samples Surface Mine · 460717830 CFR 77.1110 · $465.00 proposed penalty
Drill dust control at underground areas of underground mines.
Winchester Peerless Rachel Mine · 460925830 CFR 72.630(b) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Winchester Peerless Rachel Mine · 460925830 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
EAGLE #3 MINE · 460942730 CFR 75.202(a) · $959.00 proposed penalty
Escapeways; bituminous and lignite mines.
EAGLE #3 MINE · 460942730 CFR 75.380(d)(1) · $398.00 proposed penalty
Escapeways; bituminous and lignite mines.
EAGLE #3 MINE · 460942730 CFR 75.380(d)(7)(i) · $1,431.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.