Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Water sprinkler systems; fire warning devices at belt drives.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.1101-10 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.202(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Methane monitors.
EAGLE #3 MINE · 460942730 CFR 75.342(a)(4) · $267.00 proposed penalty
Permissible electric face equipment; maintenance.
Winchester 2 · 460961530 CFR 75.503 · $592.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(4)(iii) · $151.00 proposed penalty
Mechanical equipment guards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1722(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $398.00 proposed penalty
Preshift examination at fixed intervals.
Maple Eagle No. 1 Mine · 460423630 CFR 75.360(b)(4) · $755.00 proposed penalty
Temporary notations, revisions, and supplements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1202-1(b)(3) · $151.00 proposed penalty
Protection of trailing cables.
Maple Eagle No. 1 Mine · 460423630 CFR 75.606 · $336.00 proposed penalty
Identification of circuit breakers.
Maple Eagle No. 1 Mine · 460423630 CFR 75.904 · $151.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $465.00 proposed penalty
Identification of circuit breakers.
Maple Eagle No. 1 Mine · 460423630 CFR 75.904 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $193.00 proposed penalty
Ventilation controls.
Maple Eagle No. 1 Mine · 460423630 CFR 75.333(c)(3) · $151.00 proposed penalty
Permanent splicing of trailing cables.
Speed Mine · 460543730 CFR 75.604(b) · $642.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Samples Surface Mine · 460717830 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Samples Surface Mine · 460717830 CFR 77.1606(c) · $465.00 proposed penalty
Permanent splicing of trailing cables.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.604(b) · $336.00 proposed penalty
Verbal Hazard Complaint Inspections
Speed Mine · 460543710.0 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Escapeway maps.
Calvary No 81 · 151275330 CFR 75.1505(b) · $151.00 proposed penalty
Violation — cited standard not reported
NORTH EAGLE MINE · 4608759Significant and substantial (S&S) · $4,152.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $755.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.