Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection from falls of roof, face and ribs.
EAGLE #3 MINE · 460942730 CFR 75.202(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Underground electrical installations.
EAGLE #3 MINE · 460942730 CFR 75.340(a)(1)(i) · $432.00 proposed penalty
Verbal Hazard Complaint Inspections
Maple Eagle No. 1 Mine · 46042364.5 on-site hours reported
Spot Inspection
Maple Eagle No. 1 Mine · 460423628.5 on-site hours reported
Loading and haulage equipment; installations.
Combs Branch Job · 151688330 CFR 77.1605(d) · $165.00 proposed penalty
Loading and haulage equipment; installations.
Combs Branch Job · 151688330 CFR 77.1605(b) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
BEAR BRANCH 2 · 151856530 CFR 77.410(c) · $226.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Maintenance of diesel-powered equipment.
BEAR BRANCH 2 · 151856530 CFR 75.1914(a) · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $193.00 proposed penalty
Weekly examination.
Maple Eagle No. 1 Mine · 460423630 CFR 75.364(b)(2) · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Construction and repair of seals.
Maple Eagle No. 1 Mine · 460423630 CFR 75.337(a) · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $432.00 proposed penalty
Roof bolting.
Winchester 2 · 460961530 CFR 75.204(f)(4) · $165.00 proposed penalty
Quantity and location of firefighting equipment.
BEAR BRANCH 2 · 151856530 CFR 75.1100-2(b) · $226.00 proposed penalty
Permissible electric face equipment; maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.503 · $407.00 proposed penalty
Escapeways; bituminous and lignite mines.
BEAR BRANCH 2 · 151856530 CFR 75.380(d)(1) · $336.00 proposed penalty
Escapeways; bituminous and lignite mines.
BEAR BRANCH 2 · 151856530 CFR 75.380(d)(1) · $336.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
BEAR BRANCH 2 · 151856530 CFR 75.1103-8(c) · $226.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Automatic fire warning devices; actions and response.
BEAR BRANCH 2 · 151856530 CFR 75.1103-5(a)(1) · $226.00 proposed penalty
Permanent splicing of trailing cables.
BEAR BRANCH 2 · 151856530 CFR 75.604(c) · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BEAR BRANCH 2 · 151856530 CFR 75.512 · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.