Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protective clothing; requirements.
Blue Creek Prep Plant · 460922630 CFR 77.1710(g) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.370(a)(1) · $177.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester 2 · 460961530 CFR 75.512 · $165.00 proposed penalty
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 8.0 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 6.5 on-site hours reported
Mine ventilation plan; submission and approval.
NO. 77 · 150963630 CFR 75.370(a)(1) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
BEAR BRANCH 2 · 151856530 CFR 75.1100-2(i)(1) · $177.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $336.00 proposed penalty
Escapeways; bituminous and lignite mines.
BEAR BRANCH 2 · 151856530 CFR 75.380(d)(1) · $366.00 proposed penalty
Maintenance of diesel-powered equipment.
BEAR BRANCH 2 · 151856530 CFR 75.1914(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
BEAR BRANCH 2 · 151856530 CFR 75.1600-2(e) · Significant and substantial (S&S) · $398.00 proposed penalty
Atmospheric monitoring systems.
BEAR BRANCH 2 · 151856530 CFR 75.351(n)(1) · Significant and substantial (S&S) · $883.00 proposed penalty
Automatic fire warning devices; actions and response.
BEAR BRANCH 2 · 151856530 CFR 75.1103-5(a)(2) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Escapeways; bituminous and lignite mines.
Speed Mine · 460543730 CFR 75.380(d)(4) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Speed Mine · 460543730 CFR 75.1725(a) · $1,550.00 proposed penalty
Permanent splicing of trailing cables.
Speed Mine · 460543730 CFR 75.604(b) · $313.00 proposed penalty
Surface installations; general.
Rocklick Preparation Plant · 460644830 CFR 77.200 · $4,749.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(e) · $398.00 proposed penalty
Rock dusting.
Winchester Peerless Rachel Mine · 460925830 CFR 75.402 · $1,818.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $642.00 proposed penalty
Quantity and location of firefighting equipment.
Flying Eagle · 460947130 CFR 75.1100-2(b) · $288.00 proposed penalty
Violation — cited standard not reported
Flying Eagle · 4609471$320.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $4,047.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.