Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Permanent splicing of trailing cables.
Maple Eagle No. 1 Mine · 460423630 CFR 75.604(b) · $959.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $151.00 proposed penalty
Permanent splicing of trailing cables.
Maple Eagle No. 1 Mine · 460423630 CFR 75.604(b) · $959.00 proposed penalty
Clamping of trailing cables to equipment.
Maple Eagle No. 1 Mine · 460423630 CFR 75.605 · $226.00 proposed penalty
Machinery and equipment; operation and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1725(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Flammable liquids; storage.
Maple Eagle Preparation Plant · 460514530 CFR 77.1103(c) · $151.00 proposed penalty
Mechanical equipment guards.
Maple Eagle Preparation Plant · 460514530 CFR 77.400(c) · $151.00 proposed penalty
Other safeguards.
Speed Mine · 460543730 CFR 75.1403 · $313.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Mining methods.
Speed Mine · 460543730 CFR 75.203(e)(2) · $193.00 proposed penalty
Air quality detectors and measurement devices.
Speed Mine · 460543730 CFR 75.320(a) · $151.00 proposed penalty
Methane monitors.
Speed Mine · 460543730 CFR 75.342(a)(4) · $151.00 proposed penalty
Methane monitors.
Speed Mine · 460543730 CFR 75.342(a)(4) · $151.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(b) · $1,550.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(b) · $7,676.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(a) · $11,450.00 proposed penalty
Mechanical equipment guards.
Rocklick Preparation Plant · 460644830 CFR 77.400(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Roof control plan.
NORTH EAGLE MINE · 460875930 CFR 75.220(a)(1) · $313.00 proposed penalty
Escapeways; bituminous and lignite mines.
Winchester Peerless Rachel Mine · 460925830 CFR 75.380(d)(7)(i) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.1911(i) · $151.00 proposed penalty
Accumulation of combustible materials.
Winchester 2 · 460961530 CFR 75.400 · $165.00 proposed penalty
Installation of high-voltage transmission cables.
Winchester 2 · 460961530 CFR 75.807 · $165.00 proposed penalty
Regular Safety and Health Inspection
EAGLE #3 MINE · 4609427189.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.