← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Handling of materials

    accidentRecord 220252450028
    Calvary No 81 · 1512753

    Days away from work only

    Accident narrative

    Injured and another employee was putting a set of scoop batteries on charge. Injured bent over to pick up the female end of the jumper cable when upon doing so, they felt a pain in their back going down right leg. We were not informed of the results from the specialist until 08/28/2025.

  2. Spot Inspections

    inspectionRecord 6322997
    Speed Mine · 4605437

    103(i) · 4.0 on-site hours reported

  3. Mine ventilation plan; submission and approval.

    violationRecord 9779093
    NO. 77 · 1509636

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $697.00 proposed penalty

  4. Roof testing and scaling.

    violationRecord 9776567
    Calvary No 81 · 1512753

    30 CFR 75.211(c) · $151.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 9777337
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $336.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 9841433
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $165.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 9841432
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $165.00 proposed penalty

  8. Roof testing and scaling.

    violationRecord 9841431
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.211(d) · $151.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5022815
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5022814
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  11. Ventilation controls.

    violationRecord 5022813
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(b)(5) · $592.00 proposed penalty

  12. Weekly examination.

    violationRecord 5022812
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.364(b)(2) · $177.00 proposed penalty

  13. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5060779
    Maple Eagle Preparation Plant · 4605145

    30 CFR 77.1606(c) · $151.00 proposed penalty

  14. Mobile equipment; automatic warning devices.

    violationRecord 5060778
    Maple Eagle Preparation Plant · 4605145

    30 CFR 77.410(b) · $151.00 proposed penalty

  15. Dust accumulations in surface installations.

    violationRecord 5025360
    Rocklick Preparation Plant · 4606448

    30 CFR 77.202 · $1,219.00 proposed penalty

  16. Permissible exposure level.

    violationRecord 5024975
    NORTH EAGLE MINE · 4608759

    30 CFR 62.130(b) · $151.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 5023993
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.604(b) · $336.00 proposed penalty

  18. Escapeways; bituminous and lignite mines.

    violationRecord 5024294
    EAGLE #3 MINE · 4609427

    30 CFR 75.380(d)(7)(vii) · $151.00 proposed penalty

  19. Roof control plan.

    violationRecord 5024293
    EAGLE #3 MINE · 4609427

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  20. Electric equipment; examination, testing and maintenance.

    violationRecord 9838176
    Flying Eagle · 4609471

    30 CFR 75.512 · $245.00 proposed penalty

  21. Electric equipment; examination, testing and maintenance.

    violationRecord 9779092
    NO. 77 · 1509636

    30 CFR 75.512 · $193.00 proposed penalty

  22. Quantity and location of firefighting equipment.

    violationRecord 9779091
    NO. 77 · 1509636

    30 CFR 75.1100-2(b) · $151.00 proposed penalty

  23. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 9779090
    NO. 77 · 1509636

    30 CFR 75.1101-8(b) · $151.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 9778946
    NO. 77 · 1509636

    30 CFR 75.400 · $267.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 9778945
    NO. 77 · 1509636

    30 CFR 75.400 · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.