← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Non-Fatal Accident Investigation

    inspectionRecord 6320442
    Winchester Peerless Rachel Mine · 4609258

    5.0 on-site hours reported

  2. Accumulation of combustible materials.

    violationRecord 9778955
    BEAR BRANCH 2 · 1518565

    30 CFR 75.400 · $465.00 proposed penalty

  3. Mechanical equipment guards.

    violationRecord 9778954
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1722(c) · $226.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 5084000
    BEAR BRANCH 2 · 1518565

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  5. Methane monitors.

    violationRecord 5029809
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.342(a)(4) · $165.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5026266
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $755.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5026265
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  8. Mechanical equipment guards.

    violationRecord 5029907
    Coal Clean Prep Plant · 4608571

    30 CFR 77.400(d) · $151.00 proposed penalty

  9. Surface installations; general.

    violationRecord 5029906
    Coal Clean Prep Plant · 4608571

    30 CFR 77.200 · $151.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5024986
    Coalburg Tunnel Mine · 4608993

    30 CFR 75.1731(a) · $151.00 proposed penalty

  11. Electric equipment and circuits; overload and short circuit protection; minimum requirements.

    violationRecord 5024985
    Coalburg Tunnel Mine · 4608993

    30 CFR 75.518-1 · $151.00 proposed penalty

  12. Other safeguards.

    violationRecord 5024984
    Coalburg Tunnel Mine · 4608993

    30 CFR 75.1403 · $151.00 proposed penalty

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5024983
    Coalburg Tunnel Mine · 4608993

    30 CFR 75.1731(b) · $151.00 proposed penalty

  14. Loading and haulage equipment; installations.

    violationRecord 5025373
    Glancy Surface Mine · 4609377

    30 CFR 77.1605(d) · $465.00 proposed penalty

  15. Stripping; loose material.

    violationRecord 5025372
    Glancy Surface Mine · 4609377

    30 CFR 77.1001 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  16. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022605
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  17. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022604
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  18. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022603
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  19. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022602
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  20. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5022601
    EAGLE #3 MINE · 4609427

    30 CFR 77.1606(c) · $151.00 proposed penalty

  21. Handling of materials

    accidentRecord 220252370020
    Winchester Peerless Rachel Mine · 4609258

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was changing a battery in rubber-tired ride when EE dropped the new battery in place, battery acid splashed in EE's right eye. Eye was flushed, EE was diagnosed with a corneal abrasion, and employee received prescription eye drops. Medical Treatment Only.

  22. Spot Inspections

    inspectionRecord F00C760
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 1.5 on-site hours reported

  23. Ventilation controls.

    violationRecord 5022878
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(b)(5) · $313.00 proposed penalty

  24. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5022877
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 9847408
    Speed Mine · 4605437

    30 CFR 75.400 · $398.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.