← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Spot Inspections

    inspectionRecord F00C760
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 1.5 on-site hours reported

  2. Ventilation controls.

    violationRecord 5022878
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(b)(5) · $313.00 proposed penalty

  3. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5022877
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 9847408
    Speed Mine · 4605437

    30 CFR 75.400 · $398.00 proposed penalty

  5. Roof control plan.

    violationRecord 9847407
    Speed Mine · 4605437

    30 CFR 75.220(a)(1) · $1,550.00 proposed penalty

  6. Travelways at surface installations.

    violationRecord 5028222
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.205(b) · Significant and substantial (S&S) · $504.00 proposed penalty

  7. Mechanical equipment guards.

    violationRecord 5028221
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.400(a) · Significant and substantial (S&S) · $755.00 proposed penalty

  8. Dust accumulations in surface installations.

    violationRecord 5025320
    Toms Fork Prep Plant and Loadout · 4608465

    30 CFR 77.202 · Significant and substantial (S&S) · $755.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5024006
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  10. Escapeways; bituminous and lignite mines.

    violationRecord 5024005
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.380(d)(1) · $3,736.00 proposed penalty

  11. Preshift examination at fixed intervals.

    violationRecord 5024004
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.360(f) · $245.00 proposed penalty

  12. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5024003
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 9778953
    BEAR BRANCH 2 · 1518565

    30 CFR 75.604(b) · $245.00 proposed penalty

  14. Other safeguards.

    violationRecord 5022876
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $288.00 proposed penalty

  15. Other safeguards.

    violationRecord 5022875
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $288.00 proposed penalty

  16. Other safeguards.

    violationRecord 5022874
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $642.00 proposed penalty

  17. Rock dusting.

    violationRecord 5022873
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.402 · $193.00 proposed penalty

  18. On-shift examination.

    violationRecord 5022872
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.362(a)(1) · $267.00 proposed penalty

  19. Rock dusting.

    violationRecord 5022871
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.402 · $151.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5022870
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  21. Other safeguards.

    violationRecord 5022869
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $2,712.00 proposed penalty

  22. Loading and haulage equipment; operation.

    violationRecord 5025371
    Glancy Surface Mine · 4609377

    30 CFR 77.1607(i) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  23. Electric equipment; examination, testing and maintenance.

    violationRecord 5020360
    Winchester 2 · 4609615

    30 CFR 75.512 · $151.00 proposed penalty

  24. Mining methods.

    violationRecord 5020359
    Winchester 2 · 4609615

    30 CFR 75.203(e)(1) · $151.00 proposed penalty

  25. Preshift examination at fixed intervals.

    violationRecord 5020358
    Winchester 2 · 4609615

    30 CFR 75.360(g) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.