Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 1.5 on-site hours reported
Ventilation controls.
Maple Eagle No. 1 Mine · 460423630 CFR 75.333(b)(5) · $313.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $398.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · $1,550.00 proposed penalty
Travelways at surface installations.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.205(b) · Significant and substantial (S&S) · $504.00 proposed penalty
Mechanical equipment guards.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.400(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Dust accumulations in surface installations.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.202 · Significant and substantial (S&S) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.370(a)(1) · $245.00 proposed penalty
Escapeways; bituminous and lignite mines.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.380(d)(1) · $3,736.00 proposed penalty
Preshift examination at fixed intervals.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.360(f) · $245.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Permanent splicing of trailing cables.
BEAR BRANCH 2 · 151856530 CFR 75.604(b) · $245.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $288.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $288.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $642.00 proposed penalty
Rock dusting.
Maple Eagle No. 1 Mine · 460423630 CFR 75.402 · $193.00 proposed penalty
On-shift examination.
Maple Eagle No. 1 Mine · 460423630 CFR 75.362(a)(1) · $267.00 proposed penalty
Rock dusting.
Maple Eagle No. 1 Mine · 460423630 CFR 75.402 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $288.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $2,712.00 proposed penalty
Loading and haulage equipment; operation.
Glancy Surface Mine · 460937730 CFR 77.1607(i) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester 2 · 460961530 CFR 75.512 · $151.00 proposed penalty
Mining methods.
Winchester 2 · 460961530 CFR 75.203(e)(1) · $151.00 proposed penalty
Preshift examination at fixed intervals.
Winchester 2 · 460961530 CFR 75.360(g) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.