Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Travelways at surface installations.
Kentucky River Loading · 151349530 CFR 77.205(a) · $151.00 proposed penalty
Mechanical equipment guards.
Kentucky River Loading · 151349530 CFR 77.400(a) · Significant and substantial (S&S) · $465.00 proposed penalty
Travelways at surface installations.
Kentucky River Loading · 151349530 CFR 77.205(a) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
East Mac & Nellie · 151896630 CFR 77.410(a)(1) · $151.00 proposed penalty
Methane monitors.
Speed Mine · 460543730 CFR 75.342(a)(4) · $959.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $1,219.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Speed Mine · 460543730 CFR 75.512 · $2,312.00 proposed penalty
Power wires and cables; insulation and protection.
Speed Mine · 460543730 CFR 75.517 · $883.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
Speed Mine · 460543730 CFR 75.1107-9(a)(1) · $177.00 proposed penalty
Accumulation of combustible materials.
NORTH EAGLE MINE · 460875930 CFR 75.400 · $1,126.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester Peerless Rachel Mine · 460925830 CFR 75.202(a) · $288.00 proposed penalty
Escapeways; bituminous and lignite mines.
Winchester Peerless Rachel Mine · 460925830 CFR 75.380(d)(7)(vi) · $209.00 proposed penalty
Power wires and cables; insulation and protection.
Calvary No 81 · 151275330 CFR 75.517 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Communications facilities; refuge alternatives.
Calvary No 81 · 151275330 CFR 75.1600-3(a)(1) · $151.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
Calvary No 81 · 151275330 CFR 75.1714-3(b) · $151.00 proposed penalty
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · $755.00 proposed penalty
Permanent splicing of trailing cables.
Maple Eagle No. 1 Mine · 460423630 CFR 75.604(b) · $883.00 proposed penalty
Ventilation controls.
Speed Mine · 460543730 CFR 75.333(h) · $313.00 proposed penalty
Weekly examination.
Speed Mine · 460543730 CFR 75.364(b)(4) · $177.00 proposed penalty
Loading and haulage equipment; installations.
Samples Surface Mine · 460717830 CFR 77.1605(d) · $267.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester Peerless Rachel Mine · 460925830 CFR 75.202(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $465.00 proposed penalty
Condition and examination of firefighting equipment.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1100-3 · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $267.00 proposed penalty
Mechanical equipment guards.
Winchester 2 · 460961530 CFR 75.1722(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.