Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $209.00 proposed penalty
Protection from falls of roof, face and ribs.
EAGLE #3 MINE · 460942730 CFR 75.202(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
EAGLE #3 MINE · 460942730 CFR 75.370(a)(1) · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $1,431.00 proposed penalty
Permanent splicing of trailing cables.
Flying Eagle · 460947130 CFR 75.604(b) · $959.00 proposed penalty
Permanent splicing of trailing cables.
Flying Eagle · 460947130 CFR 75.604(b) · $959.00 proposed penalty
Machinery and equipment; operation and maintenance.
Flying Eagle · 460947130 CFR 75.1725(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Flying Eagle · 460947130 CFR 75.512 · $755.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Atmospheric monitoring systems.
Calvary No 81 · 151275330 CFR 75.351(n)(3)(i) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Combs Branch Job · 151688330 CFR 77.404(a) · Significant and substantial (S&S) · $504.00 proposed penalty
Escapeways; bituminous and lignite mines.
BEAR BRANCH 2 · 151856530 CFR 75.380(f)(5)(i) · $177.00 proposed penalty
Quantity and location of firefighting equipment.
BEAR BRANCH 2 · 151856530 CFR 75.1100-2(b) · $177.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $336.00 proposed penalty
Ventilation controls.
BEAR BRANCH 2 · 151856530 CFR 75.333(c)(1) · $177.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $549.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1731(a) · $336.00 proposed penalty
Ventilation controls.
Maple Eagle No. 1 Mine · 460423630 CFR 75.333(c)(3) · $209.00 proposed penalty
Escapeways; bituminous and lignite mines.
Speed Mine · 460543730 CFR 75.380(d)(7)(iii) · $177.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
Speed Mine · 460543730 CFR 75.1107-9(a)(1) · $193.00 proposed penalty
Mechanical equipment guards.
Samples Surface Mine · 460717830 CFR 77.400(a) · $209.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Samples Surface Mine · 460717830 CFR 77.1606(c) · $697.00 proposed penalty
Machinery and equipment; operation and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.1725(a) · $2,712.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $398.00 proposed penalty
Accumulation of combustible materials.
Winchester Peerless Rachel Mine · 460925830 CFR 75.400 · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.