Permanent splicing of trailing cables.
Maple Eagle No. 1 Mine · 460423630 CFR 75.604(b) · $642.00 proposed penalty
Permanent splicing of trailing cables.
Maple Eagle No. 1 Mine · 460423630 CFR 75.604(b) · $642.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $883.00 proposed penalty
Mechanical equipment guards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1722(b) · $642.00 proposed penalty
Loading and haulage equipment; installations.
Samples Surface Mine · 460717830 CFR 77.1605(d) · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.503 · $151.00 proposed penalty
Accumulation of combustible materials.
Winchester Peerless Rachel Mine · 460925830 CFR 75.400 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Winchester Peerless Rachel Mine · 460925830 CFR 75.512 · $151.00 proposed penalty
Mining methods.
Winchester Peerless Rachel Mine · 460925830 CFR 75.203(e)(2) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Winchester Peerless Rachel Mine · 460925830 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty
Roof control plan.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.512 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
Blue Creek No. 1 UG Mine · 460929730 CFR 72.630(b) · $151.00 proposed penalty
Roof control plan.
EAGLE #3 MINE · 460942730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Impoundment Spot Inspection
Fanco · 46013681.0 on-site hours reported
Verbal Hazard Complaint Inspections
Winchester Peerless Rachel Mine · 46092581.5 on-site hours reported
Power wires and cables; insulation and protection.
Calvary No 81 · 151275330 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty
Mine ventilation plan; submission and approval.
Calvary No 81 · 151275330 CFR 75.370(a)(1) · $165.00 proposed penalty
Accumulation of combustible materials.
BEAR BRANCH 2 · 151856530 CFR 75.400 · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
BEAR BRANCH 2 · 151856530 CFR 75.1731(b) · $226.00 proposed penalty
Self-rescue devices; use and location requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1714-2(f) · $4,749.00 proposed penalty
Communications facilities; refuge alternatives.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1600-3(a)(1) · $2,133.00 proposed penalty
Self-rescue devices; use and location requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1714-2(f) · $4,749.00 proposed penalty
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · $642.00 proposed penalty
Ventilation controls.
Maple Eagle No. 1 Mine · 460423630 CFR 75.333(h) · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.