Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
NO. 77 · 150963630 CFR 75.400 · $398.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
East Mac & Nellie · 151896630 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
East Mac & Nellie · 151896630 CFR 77.1606(c) · $151.00 proposed penalty
Hazard training.
East Mac & Nellie · 151896630 CFR 48.31(d) · $151.00 proposed penalty
Hazard training.
East Mac & Nellie · 151896630 CFR 48.31(d) · $168.00 proposed penalty
Hazard training.
East Mac & Nellie · 151896630 CFR 48.31(d) · $151.00 proposed penalty
Hazard training.
East Mac & Nellie · 151896630 CFR 48.31(d) · $168.00 proposed penalty
Dust accumulations in surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.202 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Roof control plan.
NORTH EAGLE MINE · 460875930 CFR 75.220(a)(1) · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
EAGLE #3 MINE · 460942730 CFR 75.512 · $177.00 proposed penalty
Permanent splicing of trailing cables.
COAL BRANCH NO. 2 · 460966330 CFR 75.604(b) · $1,126.00 proposed penalty
Escapeways; bituminous and lignite mines.
COAL BRANCH NO. 2 · 460966330 CFR 75.380(d)(4) · $209.00 proposed penalty
Handtools (nonpowered)
NO. 77 · 1509636Days away from work only
Accident narrative
EE's rail motor EE was operating had de-railed. EE used a jack and a bar to put the ride back on the track. Upon doing so, the jack turned over causing the bar to strike EE on the right cheek area of EE's face. The ride went back on the track at that time and EE gathered up all EE's tools and went to the outside to be checked out for precaution.
Spot Inspections
BEAR BRANCH 2 · 1518565103(i) · 5.0 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 4.5 on-site hours reported
Spot Inspections
NORTH EAGLE MINE · 4608759103(i) · 5.0 on-site hours reported
Non-Fatal Accident Investigation
COAL BRANCH NO. 2 · 46096637.0 on-site hours reported
Protection of trailing cables.
Calvary No 81 · 151275330 CFR 75.606 · Significant and substantial (S&S) · $642.00 proposed penalty
Mobile equipment; automatic warning devices.
East Mac & Nellie · 151896630 CFR 77.410(c) · $151.00 proposed penalty
Methane monitors.
Speed Mine · 460543730 CFR 75.342(a)(4) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · $2,712.00 proposed penalty
Explosives; magazines.
Samples Surface Mine · 460717830 CFR 77.1301(a) · $209.00 proposed penalty
Automatic emergency-parking brakes.
Winchester Peerless Rachel Mine · 460925830 CFR 75.523-3(c)(2) · $151.00 proposed penalty
Identification of circuit breakers.
Winchester Peerless Rachel Mine · 460925830 CFR 75.904 · Significant and substantial (S&S) · $3,448.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.