ALL STATUSES / CONTROLLER PORTFOLIO

Roger J Meyer

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0190981

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Renewable Soils4202779 · Intermittent6/8 quarters reportedSummit, UTFacility · MSHA: Construction Sand and Gravel05,48621015.5

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

21

5 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q315
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q36
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

3,207.00

15 of 21 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q33,207
  4. 2025 Q4—
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

15.50

5 inspections · 5 with hours

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q37.00
  4. 2025 Q41.50
  5. 2026 Q11.00
  6. 2026 Q2—
  7. 2026 Q36.00
  8. 2026 Q4 *0.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q200—000—
2025-Q31543,207.000017.0
2025-Q400—0011.5
2026-Q100—0011.0
2026-Q200—000—
2026-Q361—0016.0
2026-Q4 *00—0010.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF045118
    Renewable Soils · 4202779

    Compliance Follow-up Inspection · 0.0 on-site hours

  2. inspectionF045114
    Renewable Soils · 4202779

    Regular Safety and Health Inspection · 6.0 on-site hours

  3. violation5210740
    Renewable Soils · 4202779

    50.30(a)

  4. violation5210738
    Renewable Soils · 4202779

    56.4402

  5. violation5210737
    Renewable Soils · 4202779

    56.12032

  6. violation5210736
    Renewable Soils · 4202779

    56.12013

  7. violation5210735
    Renewable Soils · 4202779

    56.14100(d)

  8. violation5210734
    Renewable Soils · 4202779

    56.14132(b) · S&S

  9. inspectionF029322
    Renewable Soils · 4202779

    Mine Idle Activity · 1.0 on-site hours

  10. inspectionF0146FB
    Renewable Soils · 4202779

    Compliance Follow-up Inspection · 1.5 on-site hours

  11. violation5052989
    Renewable Soils · 4202779

    50.30(a) · $151.00 proposed

  12. violation5052988
    Renewable Soils · 4202779

    56.14100(b) · $151.00 proposed

  13. inspectionF0146F7
    Renewable Soils · 4202779

    Regular Safety and Health Inspection · 7.0 on-site hours

  14. violation5052985
    Renewable Soils · 4202779

    46.7(a) · S&S · $407.00 proposed

  15. violation5052984
    Renewable Soils · 4202779

    46.5 · S&S · $407.00 proposed

  16. violation5052983
    Renewable Soils · 4202779

    46.9(b) · $151.00 proposed

  17. violation5052982
    Renewable Soils · 4202779

    56.15003 · $151.00 proposed

  18. violation5052981
    Renewable Soils · 4202779

    56.4101 · $151.00 proposed

  19. violation5052980
    Renewable Soils · 4202779

    56.14132(a) · $151.00 proposed

  20. violation5052979
    Renewable Soils · 4202779

    56.14103(a) · $151.00 proposed

  21. violation5052978
    Renewable Soils · 4202779

    56.14100(c) · S&S · $366.00 proposed

  22. violation5052977
    Renewable Soils · 4202779

    56.9300(a) · S&S · $366.00 proposed

  23. violation5052976
    Renewable Soils · 4202779

    56.4200(b) · $151.00 proposed

  24. violation5052975
    Renewable Soils · 4202779

    56.14100(c) · $151.00 proposed

  25. violation5052974
    Renewable Soils · 4202779

    56.14100(b) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.