ACTIVE / CONTROLLER PORTFOLIO

Randall K Taylor; Ryan Johns; Todd Case

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0167680

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Huff Preparation Plant1507907 · Active6/8 quarters reportedPike, KYFacility · MSHA: Coal (Bituminous)035,709250196.8
Phelps Coal Tipple (T-2)1513193 · Active6/8 quarters reportedPike, KYFacility · MSHA: Coal (Bituminous)013,925220195.8

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

47

6 significant & substantial (S&S)

  1. 2025 Q124
  2. 2025 Q20
  3. 2025 Q311
  4. 2025 Q43
  5. 2026 Q13
  6. 2026 Q22
  7. 2026 Q34
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

6,865.00

44 of 47 violations with amounts

  1. 2025 Q13,803
  2. 2025 Q2—
  3. 2025 Q31,703
  4. 2025 Q4453
  5. 2026 Q1453
  6. 2026 Q2302
  7. 2026 Q3151
  8. 2026 Q4 *—

On-site inspection hours

392.50

11 inspections · 11 with hours

  1. 2025 Q164.50
  2. 2025 Q262.25
  3. 2025 Q342.50
  4. 2025 Q466.50
  5. 2026 Q156.75
  6. 2026 Q251.50
  7. 2026 Q348.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q12433,803.0000264.5
2025-Q200—00162.3
2025-Q31121,703.0000242.5
2025-Q431453.0000166.5
2026-Q130453.0000256.8
2026-Q220302.0000151.5
2026-Q340151.0000248.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9878806
    Phelps Coal Tipple (T-2) · 1513193

    77.204 · $151.00 proposed

  2. inspectionF01626F
    Phelps Coal Tipple (T-2) · 1513193

    Regular Safety and Health Inspection · 37.0 on-site hours

  3. violation9879445
    Huff Preparation Plant · 1507907

    77.512 · $151.00 proposed

  4. violation9879443
    Huff Preparation Plant · 1507907

    77.206(a) · S&S · $151.00 proposed

  5. violation9879441
    Huff Preparation Plant · 1507907

    77.1606(c) · $151.00 proposed

  6. violation9879440
    Huff Preparation Plant · 1507907

    77.1605(b) · $151.00 proposed

  7. inspectionF00DD22
    Huff Preparation Plant · 1507907

    Regular Safety and Health Inspection · 62.3 on-site hours

  8. inspection4135309
    Phelps Coal Tipple (T-2) · 1513193

    Spot Inspection · 3.0 on-site hours

  9. violation9882295
    Phelps Coal Tipple (T-2) · 1513193

    77.1606(c) · $151.00 proposed

  10. violation8283276
    Phelps Coal Tipple (T-2) · 1513193

    77.1104 · $151.00 proposed

  11. violation9882294
    Phelps Coal Tipple (T-2) · 1513193

    77.410(b) · $151.00 proposed

  12. violation9882293
    Phelps Coal Tipple (T-2) · 1513193

    77.410(c) · $151.00 proposed

  13. violation8283275
    Phelps Coal Tipple (T-2) · 1513193

    77.1605(d) · $151.00 proposed

  14. violation8283274
    Phelps Coal Tipple (T-2) · 1513193

    77.1605(d) · $151.00 proposed

  15. violation8282287
    Phelps Coal Tipple (T-2) · 1513193

    48.28(a) · $168.00 proposed

  16. violation8282286
    Phelps Coal Tipple (T-2) · 1513193

    77.1605(a) · $151.00 proposed

  17. violation8282285
    Phelps Coal Tipple (T-2) · 1513193

    77.404(a) · S&S · $313.00 proposed

  18. violation8282283
    Phelps Coal Tipple (T-2) · 1513193

    77.207 · $151.00 proposed

  19. violation8282282
    Phelps Coal Tipple (T-2) · 1513193

    77.1607(cc) · $151.00 proposed

  20. inspection4135308
    Phelps Coal Tipple (T-2) · 1513193

    Regular Safety and Health Inspection · 61.5 on-site hours

  21. violation9882287
    Huff Preparation Plant · 1507907

    48.29(a) · $151.00 proposed

  22. violation9882286
    Huff Preparation Plant · 1507907

    77.404(a) · S&S · $151.00 proposed

  23. violation9882285
    Huff Preparation Plant · 1507907

    77.1605(d) · $151.00 proposed

  24. violation9882284
    Huff Preparation Plant · 1507907

    77.410(c) · $151.00 proposed

  25. violation9882283
    Huff Preparation Plant · 1507907

    48.29(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS63,2184 rows · 1 receiving plants
HEAT CONTENT · BTU/LB12,523Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.75 / 10.00Separate averages over measured receipts
DELIVERED COST · USD/TON100.57100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *25,73112,5370.7510.2098.87
2025-Q424,91812,5650.759.4098.86
2026-Q3 *12,56912,4100.7310.80107.45
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11859 · preliminaryPHELPS COAL TIPPLE (T-2)1513193Wateree3297 · SC · B & W RESOURCES12,569107.4512,4100.7310.80ContractBITRail
2025-12EIA row 34488 · finalPHELPS COAL TIPPLE (T-2)1513193Wateree3297 · SC · B & W RESOURCES24,91898.8612,5650.759.40ContractBITRail
2025-09EIA row 25475 · finalPHELPS COAL TIPPLE (T-2)1513193Wateree3297 · SC · B & W RESOURCES12,82599.0312,5700.7510.20ContractBITRail
2025-08EIA row 22320 · finalPHELPS COAL TIPPLE (T-2)1513193Wateree3297 · SC · B & W RESOURCES12,90698.7112,5050.7510.20ContractBITRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED—0 of 0 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Huff Preparation Plant1507907 · Pike, Kentucky0103.84——Preparation plant10 eligible mines / 10 sales respondents
Phelps Coal Tipple (T-2)1513193 · Pike, Kentucky0103.84——Preparation plant10 eligible mines / 10 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.