  1. Communications facilities; refuge alternatives.

    violationRecord 5091361
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.1600-3(a)(2) · $366.00 proposed penalty

  2. Roof control plan information.

    violationRecord 9879333
    Laurel Fork Mine · 4609084

    30 CFR 75.221(a)(7) · $504.00 proposed penalty

  3. Use of liquefied and nonliquefied compressed gas cylinders; general requirements.

    violationRecord 9879332
    Laurel Fork Mine · 4609084

    30 CFR 75.1106-4(a) · $336.00 proposed penalty

  4. Requirement for container labels.

    violationRecord 5098224
    Berwind Deep Mine · 4609533

    30 CFR 47.41(a) · $165.00 proposed penalty

  5. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9839536
    Ram Surface Mine No. 3 · 4609578

    30 CFR 77.1606(c) · $151.00 proposed penalty

  6. Mobile equipment; automatic warning devices.

    violationRecord 9839535
    Ram Surface Mine No. 3 · 4609578

    30 CFR 77.410(b) · $151.00 proposed penalty

  7. Permissible electric face equipment; maintenance.

    violationRecord 5091360
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.503 · $592.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 9878595
    Laurel Fork Mine · 4609084

    30 CFR 75.503 · Significant and substantial (S&S) · $3,736.00 proposed penalty

  9. Machinery and equipment; operation and maintenance.

    violationRecord 9878594
    Laurel Fork Mine · 4609084

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  10. Atmospheric monitoring systems.

    violationRecord 9878593
    Laurel Fork Mine · 4609084

    30 CFR 75.351(h) · $336.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 9834791
    Crucible Deep Mine · 4609614

    30 CFR 75.400 · $504.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5092034
    Berwind Deep Mine · 4609533

    30 CFR 75.370(d) · $1,219.00 proposed penalty

  13. Criteria—Haulage; general.

    violationRecord 5092033
    Berwind Deep Mine · 4609533

    30 CFR 75.1403-10(i)

  14. Inspection of fire suppression devices.

    violationRecord 5092032
    Berwind Deep Mine · 4609533

    30 CFR 75.1107-16(b) · $366.00 proposed penalty

  15. Power wires and cables; insulation and protection.

    violationRecord 5092031
    Berwind Deep Mine · 4609533

    30 CFR 75.517 · $1,550.00 proposed penalty

  16. Clamping of trailing cables to equipment.

    violationRecord 5092030
    Berwind Deep Mine · 4609533

    30 CFR 75.605 · $165.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F004F7B
    Laurel Fork Mine · 4609084

    103(i) · 6.5 on-site hours reported

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 9878592
    Laurel Fork Mine · 4609084

    30 CFR 75.512 · $313.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 9878591
    Laurel Fork Mine · 4609084

    30 CFR 75.512 · $193.00 proposed penalty

  20. Machinery and equipment; operation and maintenance.

    violationRecord 5099902
    Elk Creek Plant · 4602444

    30 CFR 77.404(a)

  21. Respirable dust samples; report to operator; posting.

    violationRecord 5091359
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 71.208(c) · $151.00 proposed penalty

  22. Changes in electric system map; recording.

    violationRecord 5091358
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.508-2 · $151.00 proposed penalty

  23. Loading and haulage equipment; installations.

    violationRecord 5091357
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 77.1605(d) · $366.00 proposed penalty

  24. Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.

    violationRecord 5090397
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 48.3(c)(3) · $151.00 proposed penalty

  25. Main mine fan examinations and records.

    violationRecord 5090396
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.312(g)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.