Ramaco Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Ladders; construction; installation and maintenance.
Elk Creek Plant · 460244430 CFR 77.206(a) · Significant and substantial (S&S) · $366.00 proposed penalty
Travelways at surface installations.
Elk Creek Plant · 460244430 CFR 77.205(b) · Significant and substantial (S&S) · $755.00 proposed penalty
Ladders; construction; installation and maintenance.
Elk Creek Plant · 460244430 CFR 77.206(a) · Significant and substantial (S&S) · $366.00 proposed penalty
Surface installations; general.
Elk Creek Plant · 460244430 CFR 77.200 · $151.00 proposed penalty
Travelways at surface installations.
Elk Creek Plant · 460244430 CFR 77.205(b) · $755.00 proposed penalty
Mechanical equipment guards.
Elk Creek Plant · 460244430 CFR 77.400(a) · $151.00 proposed penalty
Inspection and cover plates.
Elk Creek Plant · 460244430 CFR 77.512 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Laurel Fork Mine · 460908430 CFR 75.503 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Protection from falls of roof, face and ribs.
Berwind Deep Mine · 460953330 CFR 75.202(a) · Significant and substantial (S&S) · $11,450.00 proposed penalty
Protection from falls of roof, face and ribs.
Berwind Deep Mine · 460953330 CFR 75.202(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Spot Inspections
Laurel Fork Mine · 4609084103(i) · 7.3 on-site hours reported
Loading and haulage equipment; operation.
Coal Creek Prep Plant · 440523630 CFR 77.1607(i) · $151.00 proposed penalty
Electrical connections or splices; suitability.
Stonecoal Branch Mine No. 2 · 460866330 CFR 75.514 · $1,037.00 proposed penalty
Quantity and location of firefighting equipment.
Berwind Deep Mine · 460953330 CFR 75.1100-2(i) · $549.00 proposed penalty
Criteria—Belt conveyors.
Berwind Deep Mine · 460953330 CFR 75.1403-5(g) · $313.00 proposed penalty
Tests of fire hydrants and fire hose; record of tests.
Berwind Deep Mine · 460953330 CFR 75.1103-11 · $151.00 proposed penalty
Impoundment Spot Inspection
Coal Creek Prep Plant · 440523611.5 on-site hours reported
Spot Inspections
Berwind Deep Mine · 4609533103(i) · 6.3 on-site hours reported
Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.
Coal Creek Prep Plant · 440523630 CFR 48.23(c)(2) · $151.00 proposed penalty
Changes; notification by operator.
Coal Creek Prep Plant · 440523630 CFR 41.12 · $151.00 proposed penalty
Roof testing and scaling.
Stonecoal Branch Mine No. 2 · 460866330 CFR 75.211(d) · $165.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Stonecoal Branch Mine No. 2 · 460866330 CFR 75.512 · $336.00 proposed penalty
Other safeguards.
Laurel Fork Mine · 460908430 CFR 75.1403 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Laurel Fork Mine · 460908430 CFR 75.1725(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
Laurel Fork Mine · 460908430 CFR 75.601-1 · $592.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.