Ramaco Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Slip or fall of person
Berwind Deep Mine · 4609533Days away from work only
Accident narrative
Employee stepped down off the flat car and twisted EE's ankle while unloading supplies.
Accumulations of combustible materials.
Big Creek Surface · 440716230 CFR 77.1104 · $151.00 proposed penalty
Accumulations of combustible materials.
Big Creek Surface · 440716230 CFR 77.1104 · $151.00 proposed penalty
Accumulations of combustible materials.
Big Creek Surface · 440716230 CFR 77.1104 · $151.00 proposed penalty
Accumulations of combustible materials.
Big Creek Surface · 440716230 CFR 77.1104 · $151.00 proposed penalty
Ventilation controls.
Stonecoal Branch Mine No. 2 · 460866330 CFR 75.333(c)(3) · $313.00 proposed penalty
Protection from falls of roof, face and ribs.
NO. 2 GAS · 460954130 CFR 75.202(a) · Significant and substantial (S&S) · $549.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
NO. 2 GAS · 460954130 CFR 77.701 · $818.00 proposed penalty
Mine ventilation plan; submission and approval.
NO. 2 GAS · 460954130 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,569.00 proposed penalty
Mine ventilation plan; submission and approval.
NO. 2 GAS · 460954130 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Independent contractor register.
Crucible Deep Mine · 460961430 CFR 45.4(b) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
Crucible Deep Mine · 460961430 CFR 75.403 · $151.00 proposed penalty
Regular Safety and Health Inspection
Big Creek Surface · 440716281.5 on-site hours reported
Mechanical equipment guards.
Berwind Preparation Plant · 460544930 CFR 77.400(c) · $151.00 proposed penalty
Dust accumulations in surface installations.
Berwind Preparation Plant · 460544930 CFR 77.202 · $165.00 proposed penalty
Travelways at surface installations.
Berwind Preparation Plant · 460544930 CFR 77.205(b) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
Berwind Preparation Plant · 460544930 CFR 77.410(c) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
NO. 2 GAS · 460954130 CFR 75.1100-2(b) · $151.00 proposed penalty
Roof control plan.
Crucible Deep Mine · 460961430 CFR 75.220(a)(1) · $549.00 proposed penalty
Spot Inspections
Berwind Deep Mine · 4609533103(i) · 8.0 on-site hours reported
Ventilation controls.
Berwind Deep Mine · 460953330 CFR 75.333(b)(1) · $1,550.00 proposed penalty
Mine ventilation plan; submission and approval.
Berwind Deep Mine · 460953330 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Mine ventilation plan; submission and approval.
Berwind Deep Mine · 460953330 CFR 75.370(a)(1) · $755.00 proposed penalty
Accumulation of combustible materials.
Berwind Deep Mine · 460953330 CFR 75.400 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Mine ventilation plan; submission and approval.
Berwind Deep Mine · 460953330 CFR 75.370(a)(1) · $755.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.