Ramaco Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Loading and haulage equipment; inspection and maintenance.
Ram Surface Mine No. 1 · 460953730 CFR 77.1606(c) · $398.00 proposed penalty
Loading and haulage equipment; installations.
Ram Surface Mine No. 1 · 460953730 CFR 77.1605(a) · $177.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Ram Surface Mine No. 1 · 460953730 CFR 77.1606(c) · $267.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Ram Surface Mine No. 1 · 460953730 CFR 77.1606(c) · $267.00 proposed penalty
Escapeways; bituminous and lignite mines.
NO. 2 GAS · 460954130 CFR 75.380(d)(1) · Significant and substantial (S&S) · $15,768.00 proposed penalty
Escapeways; bituminous and lignite mines.
NO. 2 GAS · 460954130 CFR 75.380(d)(7)(iii) · $818.00 proposed penalty
Ventilation controls.
NO. 2 GAS · 460954130 CFR 75.333(b)(3) · $245.00 proposed penalty
Ventilation controls.
NO. 2 GAS · 460954130 CFR 75.333(b)(1) · $245.00 proposed penalty
Fire suppression devices; approved components; installation requirements.
NO. 2 GAS · 460954130 CFR 75.1107-3(d) · $245.00 proposed penalty
Other safeguards.
NO. 2 GAS · 460954130 CFR 75.1403 · $366.00 proposed penalty
Ground control; inspection and maintenance; general.
Ram Surface Mine No. 1 · 460953730 CFR 77.1004(b) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Loading and haulage equipment; installations.
Ram Surface Mine No. 1 · 460953730 CFR 77.1605(d) · $151.00 proposed penalty
Insulating mats at power switches.
Ram Surface Mine No. 1 · 460953730 CFR 77.513 · $267.00 proposed penalty
Weekly examination.
NO. 2 GAS · 460954130 CFR 75.364(b)(2) · $245.00 proposed penalty
Spot Inspections
Berwind Deep Mine · 4609533103(i) · 7.8 on-site hours reported
Protection from falls of roof, face and ribs.
Berwind Deep Mine · 460953330 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Ventilation controls.
Berwind Deep Mine · 460953330 CFR 75.333(h) · $398.00 proposed penalty
Main mine fan examinations and records.
Berwind Deep Mine · 460953330 CFR 75.312(e) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Berwind Deep Mine · 460953330 CFR 75.370(a)(1) · $9,757.00 proposed penalty
Protection from falls of roof, face and ribs.
Berwind Deep Mine · 460953330 CFR 75.202(a) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Storage of materials.
Berwind Deep Mine · 460953330 CFR 77.208(d) · $313.00 proposed penalty
Maintenance of incombustible content of rock dust.
NO. 2 GAS · 460954130 CFR 75.403 · $245.00 proposed penalty
Maintenance of incombustible content of rock dust.
NO. 2 GAS · 460954130 CFR 75.403 · $245.00 proposed penalty
Installation of main mine fans.
Berwind Deep Mine · 460953330 CFR 75.310(a)(5) · $1,818.00 proposed penalty
Travelways at surface installations.
Berwind Deep Mine · 460953330 CFR 77.205(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.