← Ramaco Resources Inc

Ramaco Resources Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-11-07Database snapshot · 2026-11-07

Safety activity

  1. Spot Inspection

    inspectionRecord F026023
    Berwind Deep Mine · 4609533

    4.0 on-site hours reported

  2. Water, sediment, or slurry impoundments and impounding structures; general.

    violationRecord 9599134
    Elk Creek Plant · 4602444

    30 CFR 77.216(d) · $151.00 proposed penalty

  3. Electrical Technical Investigation

    inspectionRecord 7047767
    NO. 2 GAS · 4609541

    12.0 on-site hours reported

  4. Spot Inspection

    inspectionRecord 7048619
    Crucible Deep Mine · 4609614

    14.0 on-site hours reported

  5. Violation — cited standard not reported

    violationRecord 5090219
    Berwind Deep Mine · 4609533

    $168.00 proposed penalty

  6. Violation — cited standard not reported

    violationRecord 5090218
    Berwind Deep Mine · 4609533

    $5,716.00 proposed penalty

  7. Quarterly sampling; mechanized mining units.

    violationRecord 5090138
    Berwind Deep Mine · 4609533

    30 CFR 70.208(b)(3) · $1,037.00 proposed penalty

  8. Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers.

    violationRecord 9837133
    NO. 2 GAS · 4609541

    30 CFR 75.900 · Significant and substantial (S&S) · $4,047.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 9838331
    Crucible Deep Mine · 4609614

    30 CFR 75.202(a) · $165.00 proposed penalty

  10. Spot Inspections

    inspectionRecord F004F6D
    Laurel Fork Mine · 4609084

    103(i) · 5.8 on-site hours reported

  11. Spot Inspections

    inspectionRecord F026022
    Berwind Deep Mine · 4609533

    103(i) · 6.0 on-site hours reported

  12. Verbal Hazard Complaint Inspections

    inspectionRecord F0107CE
    Berwind Deep Mine · 4609533

    8.5 on-site hours reported

  13. Loading and haulage equipment; inspection and maintenance.

    violationRecord 8284551
    Coal Creek Prep Plant · 4405236

    30 CFR 77.1606(c) · $151.00 proposed penalty

  14. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 9879868
    Laurel Fork Mine · 4609084

    30 CFR 75.601-1 · $151.00 proposed penalty

  15. Escapeway maps.

    violationRecord 9879867
    Laurel Fork Mine · 4609084

    30 CFR 75.1505(b) · $288.00 proposed penalty

  16. Atmospheric monitoring systems.

    violationRecord 9879866
    Laurel Fork Mine · 4609084

    30 CFR 75.351(c)(4) · $959.00 proposed penalty

  17. Atmospheric monitoring systems.

    violationRecord 9879865
    Laurel Fork Mine · 4609084

    30 CFR 75.351(o)(1)(ii) · $151.00 proposed penalty

  18. Quarterly sampling; mechanized mining units.

    violationRecord 5090217
    Berwind Deep Mine · 4609533

    30 CFR 70.208(b)(3) · $1,037.00 proposed penalty

  19. Roof control plan.

    violationRecord 5090137
    Berwind Deep Mine · 4609533

    30 CFR 75.220(a)(1) · $642.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5090136
    Berwind Deep Mine · 4609533

    30 CFR 75.400 · $288.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 9838290
    Berwind Deep Mine · 4609533

    30 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  22. Condition and examination of firefighting equipment.

    violationRecord 9838289
    Berwind Deep Mine · 4609533

    30 CFR 75.1100-3 · $398.00 proposed penalty

  23. Violation — cited standard not reported

    violationRecord 9838288
    Berwind Deep Mine · 4609533

    $348.00 proposed penalty

  24. Condition and examination of firefighting equipment.

    violationRecord 5090216
    Berwind Deep Mine · 4609533

    30 CFR 75.1100-3 · $193.00 proposed penalty

  25. Condition and examination of firefighting equipment.

    violationRecord 5090215
    Berwind Deep Mine · 4609533

    30 CFR 75.1100-3 · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.