← Prairie State Energy Campus Management Inc

Prairie State Energy Campus Management Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inspection of fire suppression devices.

    violationRecord 5015311
    Lively Grove Mine · 1103193

    30 CFR 75.1107-16(b)

  2. Handling of materials

    accidentRecord 220262680011
    Lively Grove Mine · 1103193

    Days away from work only

    Accident narrative

    Installing cable bolts in Unit 1 and while pushing bolt up, felt pop in left arm/elbow. Employee continued to work until they were taken off later in the month.

  3. Mechanical equipment guards.

    violationRecord 5015546
    Lively Grove Mine · 1103193

    30 CFR 75.1722(a)

  4. Automatic emergency-parking brakes.

    violationRecord 5015310
    Lively Grove Mine · 1103193

    30 CFR 75.523-3(c)(2)

  5. Permanent splicing of trailing cables.

    violationRecord 5015309
    Lively Grove Mine · 1103193

    30 CFR 75.604(b) · Significant and substantial (S&S)

  6. Spot Inspections

    inspectionRecord F00B6D1
    Lively Grove Mine · 1103193

    103(i) · 3.5 on-site hours reported

  7. Accumulation of combustible materials.

    violationRecord 9781762
    Lively Grove Mine · 1103193

    30 CFR 75.400 · $366.00 proposed penalty

  8. Protection of trailing cables.

    violationRecord 5015308
    Lively Grove Mine · 1103193

    30 CFR 75.606 · $592.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5015545
    Lively Grove Mine · 1103193

    30 CFR 75.400 · $336.00 proposed penalty

  10. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5015544
    Lively Grove Mine · 1103193

    30 CFR 75.1909(a)(1) · $177.00 proposed penalty

  11. Roof control plan.

    violationRecord 5015543
    Lively Grove Mine · 1103193

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  12. Roof control plan.

    violationRecord 5015542
    Lively Grove Mine · 1103193

    30 CFR 75.220(a)(1) · $883.00 proposed penalty

  13. Permissible electric face equipment; maintenance.

    violationRecord 5015307
    Lively Grove Mine · 1103193

    30 CFR 75.503 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  14. Power wires and cables; insulation and protection.

    violationRecord 5015306
    Lively Grove Mine · 1103193

    30 CFR 75.517 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  15. Maintenance of diesel-powered equipment.

    violationRecord 5015541
    Lively Grove Mine · 1103193

    30 CFR 75.1914(a) · $177.00 proposed penalty

  16. Spot Inspections

    inspectionRecord 4257389
    Lively Grove Mine · 1103193

    103(i) · 4.5 on-site hours reported

  17. Permissible electric face equipment; maintenance.

    violationRecord 5015305
    Lively Grove Mine · 1103193

    30 CFR 75.503 · $267.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5015304
    Lively Grove Mine · 1103193

    30 CFR 75.503 · $267.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F0110D2
    Lively Grove Mine · 1103193

    103(i) · 5.5 on-site hours reported

  20. Protection from falls of roof, face and ribs.

    violationRecord 9548780
    Lively Grove Mine · 1103193

    30 CFR 75.202(a) · $336.00 proposed penalty

  21. Roof control plan.

    violationRecord 5015540
    Lively Grove Mine · 1103193

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 9548778
    Lively Grove Mine · 1103193

    30 CFR 75.400 · $366.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 9548777
    Lively Grove Mine · 1103193

    30 CFR 75.202(a) · $336.00 proposed penalty

  24. Roof control plan.

    violationRecord 9548776
    Lively Grove Mine · 1103193

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  25. Electric equipment; examination, testing and maintenance.

    violationRecord 5015539
    Lively Grove Mine · 1103193

    30 CFR 75.512 · $267.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.