Prairie State Energy Campus Management Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mine ventilation plan; submission and approval.
Lively Grove Mine · 110319330 CFR 75.370(a)(1) · $267.00 proposed penalty
Accumulation of combustible materials.
Lively Grove Mine · 110319330 CFR 75.400 · $398.00 proposed penalty
Power wires and cables; insulation and protection.
Lively Grove Mine · 110319330 CFR 75.517 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Preshift examination at fixed intervals.
Lively Grove Mine · 110319330 CFR 75.360(a)(1) · $755.00 proposed penalty
Roof control plan.
Lively Grove Mine · 110319330 CFR 75.220(a)(1) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Permissible electric face equipment; maintenance.
Lively Grove Mine · 110319330 CFR 75.503 · $165.00 proposed penalty
Accumulation of combustible materials.
Lively Grove Mine · 110319330 CFR 75.400 · $366.00 proposed penalty
Power wires and cables; insulation and protection.
Lively Grove Mine · 110319330 CFR 75.517 · Significant and substantial (S&S) · $3,736.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lively Grove Mine · 110319330 CFR 75.512 · $267.00 proposed penalty
Disorders (repeated trauma)
Lively Grove Mine · 1103193Occupatnal illness not deg 1-6
Accident narrative
Employee reported numbness in right hand. They continued to work until surgery in August.
Roof control plan.
Lively Grove Mine · 110319330 CFR 75.220(a)(1) · $313.00 proposed penalty
Verbal Hazard Complaint Inspections
Lively Grove Mine · 11031932.5 on-site hours reported
Protection from falls of roof, face and ribs.
Lively Grove Mine · 110319330 CFR 75.202(a) · $313.00 proposed penalty
Drill dust control at underground areas of underground mines.
Lively Grove Mine · 110319330 CFR 72.630(b) · $366.00 proposed penalty
Permanent splicing of trailing cables.
Lively Grove Mine · 110319330 CFR 75.604(b) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Power wires and cables; insulation and protection.
Lively Grove Mine · 110319330 CFR 75.517 · Significant and substantial (S&S) · $4,749.00 proposed penalty
Regular Safety and Health Inspection
Lively Grove Mine · 1103193719.5 on-site hours reported
Spot Inspections
Lively Grove Mine · 1103193103(i) · 5.0 on-site hours reported
Spot Inspection
Lively Grove Mine · 11031936.0 on-site hours reported
Handling of materials
Lively Grove Mine · 1103193Days away from work only
Accident narrative
An area light for the continuous miner slipped out of a maintenance co-workers hand and struck this employee's left hand.
Spot Inspections
Lively Grove Mine · 1103193103(i) · 6.3 on-site hours reported
Handling of materials
Lively Grove Mine · 1103193Days away from work only
Accident narrative
Employee felt pull in right shoulder when pulling drill steel out of roof in Unit 1 (39+60 12 R)
Disorders (repeated trauma)
Lively Grove Mine · 1103193Occupatnal illness not deg 1-6
Accident narrative
Employee reported EE's hands going numb and problems with elbows. EE continued to work until EE had surgery.
Examination and maintenance of firefighting equipment.
Lively Grove Mine · 110319330 CFR 77.1110 · $151.00 proposed penalty
Rock dusting.
Lively Grove Mine · 110319330 CFR 75.402 · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.