MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Boone North No. 2 Surface Mine4609070 · Active6/8 quarters reportedBoone, WVSurface · MSHA: Coal (Bituminous)112,030141,896415364.8
Bull Creek Prep & Refuse Disp Facility4608940 · Active6/8 quarters reportedBoone, WVFacility · MSHA: Coal (Bituminous)031,372460220.0
Choctaw Mine0100347 · Active6/8 quarters reportedWalker, ALSurface · MSHA: Coal (Bituminous)08,2502054.0
Coal Mountain No 1 Surface4609062 · Active6/8 quarters reportedWyoming, WVSurface · MSHA: Coal (Bituminous)2,125,51684,061196111,277.8
Harry's Branch Surface Mine4609651 · Active6/8 quarters reportedMingo, WVSurface · MSHA: Coal (Bituminous)158,12588,545403273.3
HWM 434609650 · Active6/8 quarters reportedBoone, WVSurface · MSHA: Coal (Bituminous)110,48538,412110139.5
Ned's Branch Surface Mine4609616 · Active6/8 quarters reportedMingo, WVSurface · MSHA: Coal (Bituminous)224,69276,117341224.5

LOCATION

Portfolio map

7 of 7 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

370

100 significant & substantial (S&S)

  1. 2025 Q178
  2. 2025 Q229
  3. 2025 Q353
  4. 2025 Q434
  5. 2026 Q154
  6. 2026 Q224
  7. 2026 Q384
  8. 2026 Q4 *14

Accident records

20

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q23
  3. 2025 Q34
  4. 2025 Q43
  5. 2026 Q14
  6. 2026 Q23
  7. 2026 Q32
  8. 2026 Q4 *0

Proposed penalties · USD

298,562.00

322 of 370 violations with amounts

  1. 2025 Q153,573
  2. 2025 Q27,139
  3. 2025 Q340,119
  4. 2025 Q424,068
  5. 2026 Q1116,467
  6. 2026 Q224,568
  7. 2026 Q332,628
  8. 2026 Q4 *—

On-site inspection hours

2,553.75

60 inspections · 60 with hours

  1. 2025 Q1336.00
  2. 2025 Q2590.00
  3. 2025 Q354.25
  4. 2025 Q4278.75
  5. 2026 Q1483.50
  6. 2026 Q2738.50
  7. 2026 Q346.00
  8. 2026 Q4 *26.75
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1781753,573.001010336.0
2025-Q22987,139.00309590.0
2025-Q3531340,119.0040554.3
2025-Q434724,068.00306278.8
2026-Q15421116,467.004013483.5
2026-Q224924,568.00309738.5
2026-Q3841932,628.0020546.0
2026-Q4 *146—00326.8

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5025245
    Bull Creek Prep & Refuse Disp Facility · 4608940

    77.205(b) · S&S · $267.00 proposed

  2. violation5025928
    Bull Creek Prep & Refuse Disp Facility · 4608940

    77.404(a) · S&S · $398.00 proposed

  3. inspectionF00D659
    Bull Creek Prep & Refuse Disp Facility · 4608940

    Regular Safety and Health Inspection · 90.0 on-site hours

  4. inspection6323096
    HWM 43 · 4609650

    Regular Safety and Health Inspection · 6.0 on-site hours

  5. accident220251340016
    Coal Mountain No 1 Surface · 4609062

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was climbing up onto equipment and pulled muscle in their left shoulder. Employee had same injury and surgery on same shoulder 8/23.

  6. accident220251220013
    Coal Mountain No 1 Surface · 4609062

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    IW was installing the transmission in a 988G S/N:BNH01439. Zip tie was wrapped around the male threaded hose fitting that was placed as a marker. Zip tie had to be removed for proper seating of hose fitting. When cutting the zip tie the utility knife slipped and struck them in the lower right leg below calf. They alerted the other tech of incident. IW went to ER.

  7. inspectionF01C2A4
    Choctaw Mine · 0100347

    Regular Safety and Health Inspection · 13.0 on-site hours

  8. violation9639486
    Choctaw Mine · 0100347

    77.1606(c) · $151.00 proposed

  9. accident220251120010
    Coal Mountain No 1 Surface · 4609062

    POWERED HAULAGE · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was tramming coal loader and hit a dip in the road. Employee felt pain in lower back for approx 5 mins. Employee woke up the next day with pain in lower back and hamstrings.

  10. inspection7048719
    Coal Mountain No 1 Surface · 4609062

    Non-Injury Accident Investigation · 15.5 on-site hours

  11. violation9837914
    Coal Mountain No 1 Surface · 4609062

    Description not reported

  12. inspectionF0116C6
    Coal Mountain No 1 Surface · 4609062

    Spot Inspection · 2.0 on-site hours

  13. inspectionF014D27
    Choctaw Mine · 0100347

    Spot Inspection · 1.0 on-site hours

  14. inspectionF009DF9
    Harry's Branch Surface Mine · 4609651

    Health Technical Investigation · 11.0 on-site hours

  15. violation9639481
    Choctaw Mine · 0100347

    50.30 · $151.00 proposed

  16. violation9837491
    Harry's Branch Surface Mine · 4609651

    71.209(a) · $151.00 proposed

  17. violation9838967
    Coal Mountain No 1 Surface · 4609062

    77.1605(b) · S&S · $6,037.00 proposed

  18. violation9838966
    Coal Mountain No 1 Surface · 4609062

    77.1606(c) · $267.00 proposed

  19. violation9838965
    Coal Mountain No 1 Surface · 4609062

    77.1606(c) · $398.00 proposed

  20. violation9838964
    Coal Mountain No 1 Surface · 4609062

    77.210(a) · $151.00 proposed

  21. violation9838963
    Coal Mountain No 1 Surface · 4609062

    77.1606(c) · $267.00 proposed

  22. violation9848220
    Boone North No. 2 Surface Mine · 4609070

    77.404(a) · S&S · $697.00 proposed

  23. violation9848219
    Boone North No. 2 Surface Mine · 4609070

    77.1606(c) · $2,133.00 proposed

  24. violation9838962
    Coal Mountain No 1 Surface · 4609062

    77.1110 · $151.00 proposed

  25. violation9838961
    Coal Mountain No 1 Surface · 4609062

    77.1605(d) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS35,7263 rows · 2 receiving plants
HEAT CONTENT · BTU/LB12,533Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.71 / 8.26Separate averages over measured receipts
DELIVERED COST · USD/TON109.58100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q424,44612,6300.708.16109.77
2026-Q3 *11,28012,3220.728.50109.17
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 12281 · preliminaryCOAL MOUNTAIN #1 SURFACE4609062Clover7213 · VA · EAGLE SUMMIT RESOURCES, LLC11,280109.1712,3220.728.50SpotBITRail
2025-11EIA row 31502 · finalCOAL MOUNTAIN #1 SURFACE4609062Wateree3297 · SC · REFLECTANCE SALES COMPANY WV12,145109.5312,5900.677.30SpotBITRail
2025-10EIA row 28552 · finalCOAL MOUNTAIN #1 SURFACE4609062Wateree3297 · SC · REFLECTANCE SALES COMPANY WV12,301110.0012,6700.739.00SpotBITRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON130.36Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS1,562,239Allocated from published county sales
ESTIMATED COAL REVENUE · USD203,651,458Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED98.7%4 of 5 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Coal Mountain No 1 Surface4609062 · Wyoming, West Virginia932,364151.85949,968144,252,653County allocation estimate14.10% of eligible county production18 eligible mines / 18 sales respondents
Ned's Branch Surface Mine4609616 · Mingo, West Virginia322,31993.46330,05130,846,542County allocation estimate12.54% of eligible county production8 eligible mines / 8 sales respondents
Boone North No. 2 Surface Mine4609070 · Boone, West Virginia133,590101.17144,16914,585,551County allocation estimate4.64% of eligible county production9 eligible mines / 9 sales respondents
Hwm 434609650 · Boone, West Virginia127,922101.17138,05213,966,711County allocation estimate4.44% of eligible county production9 eligible mines / 9 sales respondents
Choctaw Mine0100347 · Location unavailable————No matching annual production record
Bull Creek Prep & Refuse Disp4608940 · Boone, West Virginia0101.17——Preparation plant9 eligible mines / 9 sales respondents
Harry's Branch Surface Mine4609651 · Mingo, West Virginia19,56793.46——Below EIA sales-reporting threshold8 eligible mines / 8 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

4 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.