ALL STATUSES / CONTROLLER PORTFOLIO

Peter R Dawson

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0108687

MINE PORTFOLIO

7 of 7 mines and facilities

2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Chico 14105110 · Active6/8 quarters reportedWise, TXSurface · MSHA: Crushed, Broken Limestone NEC0191,65946199.5
Chico 2 Quarry4104827 · Active6/8 quarters reportedWise, TXSurface · MSHA: Crushed, Broken Limestone NEC0111,76633066.0
Coleman Quarry3402246 · Active6/8 quarters reportedAtoka, OKSurface · MSHA: Crushed, Broken Limestone NEC060,288372204.5
Mill Creek Quarry3402207 · Active6/8 quarters reportedJohnston, OKSurface · MSHA: Crushed, Broken Granite0114,19124249.8
BUTLER3401840 · AbandonedHaskell, OKSurface · MSHA: Crushed, Broken Limestone NEC——00—
COOKE COUNTY4104836 · AbandonedCooke, TXSurface · MSHA: Crushed, Broken Stone NEC——00—
SCANTLEN3402013 · AbandonedHaskell, OKSurface · MSHA: Dimension Stone NEC——00—

LOCATION

Portfolio map

7 of 7 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

140

30 significant & substantial (S&S)

  1. 2025 Q112
  2. 2025 Q220
  3. 2025 Q322
  4. 2025 Q414
  5. 2026 Q137
  6. 2026 Q20
  7. 2026 Q335
  8. 2026 Q4 *0

Accident records

5

1 records classified as fatality

  1. 2025 Q12
  2. 2025 Q22
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

177,802.00

135 of 140 violations with amounts

  1. 2025 Q15,699
  2. 2025 Q27,793
  3. 2025 Q315,382
  4. 2025 Q45,931
  5. 2026 Q1129,361
  6. 2026 Q2—
  7. 2026 Q313,636
  8. 2026 Q4 *—

On-site inspection hours

419.75

25 inspections · 25 with hours

  1. 2025 Q133.25
  2. 2025 Q2198.00
  3. 2025 Q342.25
  4. 2025 Q424.00
  5. 2026 Q135.75
  6. 2026 Q2—
  7. 2026 Q386.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11215,699.0020333.3
2025-Q22097,793.00216198.0
2025-Q322215,382.0000342.3
2025-Q41435,931.0000224.0
2026-Q1377129,361.0000435.8
2026-Q200—000—
2026-Q335813,636.0010786.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9797754
    Coleman Quarry · 3402246

    46.9(a) · $151.00 proposed

  2. violation9797753
    Coleman Quarry · 3402246

    46.9(a) · $151.00 proposed

  3. violation9797752
    Coleman Quarry · 3402246

    46.6(b) · S&S · $233.00 proposed

  4. violation9796130
    Coleman Quarry · 3402246

    56.18002 · S&S · $1,550.00 proposed

  5. violation9796129
    Coleman Quarry · 3402246

    56.9300(a) · S&S · $697.00 proposed

  6. violation9796128
    Coleman Quarry · 3402246

    56.12023 · $151.00 proposed

  7. violation9796127
    Coleman Quarry · 3402246

    56.4101 · $151.00 proposed

  8. violation5004701
    Coleman Quarry · 3402246

    46.3(b)(4) · $151.00 proposed

  9. violation5004700
    Coleman Quarry · 3402246

    46.11(a) · S&S · $465.00 proposed

  10. violation5004699
    Coleman Quarry · 3402246

    56.15001 · $151.00 proposed

  11. violation5004698
    Coleman Quarry · 3402246

    41.30 · $151.00 proposed

  12. inspectionF019DCC
    Coleman Quarry · 3402246

    Spot Inspection · 28.0 on-site hours

  13. violation5004697
    Coleman Quarry · 3402246

    56.9300(a) · S&S · $465.00 proposed

  14. violation5004696
    Coleman Quarry · 3402246

    56.14105 · S&S · $697.00 proposed

  15. violation5004695
    Coleman Quarry · 3402246

    56.9300(b) · S&S · $151.00 proposed

  16. violation5004694
    Coleman Quarry · 3402246

    56.9300(a) · S&S · $151.00 proposed

  17. violation5004693
    Coleman Quarry · 3402246

    56.9100(a) · S&S · $1,550.00 proposed

  18. accident220251810009
    Coleman Quarry · 3402246

    MACHINERY · FATALITY

    Accident narrative

    It rained and the mining pit needed to be dewatered. EE was at the mine site alone. It was reported that EE's spouse, was in the truck on the mine site while EE went into the pit. EE moved the telehandler into the pit, parked it on the bottom of the pit parallel on the ramp. EE exited the tele. While standing outside of the tele facing east, the tele fell over onto EE, crushing EE.

  19. inspectionF019DCB
    Coleman Quarry · 3402246

    Fatal Accident Investigation · 150.0 on-site hours

  20. violation5004692
    Coleman Quarry · 3402246

    Description not reported

  21. inspectionF0126E7
    Chico 1 · 4105110

    Compliance Follow-up Inspection · 3.0 on-site hours

  22. accident220251640004
    Coleman Quarry · 3402246

    SLIP OR FALL OF PERSON · DYS AWY FRM WRK & RESTRCTD ACT

    Accident narrative

    Climbing into the 490 excavator. EE placed foot on step, grabbed handle with right hand and then grabbed left handle with left hand. As EE added weight to foot to hoist self up EE's foot slipped and EE's left hand lost grip, leaving EE's right arm to catch all EE's weight.

  23. violation9795725
    Chico 1 · 4105110

    56.11001 · $313.00 proposed

  24. violation9795724
    Chico 1 · 4105110

    56.11001 · $313.00 proposed

  25. inspectionF0126E4
    Chico 1 · 4105110

    Verbal Hazard Complaint Inspections · 1.5 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

2 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.