ACTIVE / CONTROLLER PORTFOLIO

Metinvest B V

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0085453

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
AFFINITY MINE4608878 · Active6/8 quarters reportedRaleigh, WVUnderground · MSHA: Coal (Bituminous)1,136,251908,846465324,785.8
Affinity Preparation Plant4608879 · Active6/8 quarters reportedRaleigh, WVFacility · MSHA: Coal (Bituminous)093,972170350.5

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

482

60 significant & substantial (S&S)

  1. 2025 Q150
  2. 2025 Q276
  3. 2025 Q338
  4. 2025 Q476
  5. 2026 Q185
  6. 2026 Q283
  7. 2026 Q368
  8. 2026 Q4 *6

Accident records

32

0 records classified as fatality

  1. 2025 Q13
  2. 2025 Q26
  3. 2025 Q38
  4. 2025 Q42
  5. 2026 Q17
  6. 2026 Q22
  7. 2026 Q34
  8. 2026 Q4 *0

Proposed penalties · USD

197,853.00

447 of 482 violations with amounts

  1. 2025 Q118,037
  2. 2025 Q221,103
  3. 2025 Q37,739
  4. 2025 Q427,780
  5. 2026 Q189,493
  6. 2026 Q224,332
  7. 2026 Q39,369
  8. 2026 Q4 *—

On-site inspection hours

5,136.25

152 inspections · 152 with hours

  1. 2025 Q1627.50
  2. 2025 Q2824.50
  3. 2025 Q3729.00
  4. 2025 Q4690.75
  5. 2026 Q1761.00
  6. 2026 Q2775.00
  7. 2026 Q3634.25
  8. 2026 Q4 *94.25
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q150318,037.003015627.5
2025-Q276221,103.006027824.5
2025-Q33847,739.008024729.0
2025-Q4761027,780.002016690.8
2026-Q1852489,493.007024761.0
2026-Q2831224,332.002026775.0
2026-Q36849,369.004015634.3
2026-Q4 *61—00594.3

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5097412
    AFFINITY MINE · 4608878

    75.400 · $151.00 proposed

  2. violation5097411
    AFFINITY MINE · 4608878

    75.503 · $151.00 proposed

  3. violation5092937
    AFFINITY MINE · 4608878

    75.604(b) · $151.00 proposed

  4. violation5092936
    AFFINITY MINE · 4608878

    75.370(a)(1) · $151.00 proposed

  5. violation5092935
    AFFINITY MINE · 4608878

    75.1403 · S&S · $697.00 proposed

  6. inspectionF021036
    AFFINITY MINE · 4608878

    Verbal Hazard Complaint Inspections · 4.8 on-site hours

  7. violation5095168
    AFFINITY MINE · 4608878

    75.400 · $151.00 proposed

  8. violation5095167
    AFFINITY MINE · 4608878

    75.400 · $165.00 proposed

  9. violation5095166
    AFFINITY MINE · 4608878

    75.400 · $165.00 proposed

  10. violation5095170
    AFFINITY MINE · 4608878

    75.202(a) · S&S · $313.00 proposed

  11. violation5095169
    AFFINITY MINE · 4608878

    75.370(a)(1) · S&S · $642.00 proposed

  12. violation5025480
    AFFINITY MINE · 4608878

    75.1103-4(a)(1)(iv) · $151.00 proposed

  13. inspectionF01AABE
    AFFINITY MINE · 4608878

    103(i) Spot Inspections · 6.3 on-site hours

  14. violation5092934
    AFFINITY MINE · 4608878

    75.515 · $151.00 proposed

  15. violation5092933
    AFFINITY MINE · 4608878

    75.400 · $165.00 proposed

  16. inspectionF0170E0
    Affinity Preparation Plant · 4608879

    Verbal Hazard Complaint Inspections · 2.0 on-site hours

  17. violation5092928
    AFFINITY MINE · 4608878

    75.363(b) · $432.00 proposed

  18. violation5092927
    AFFINITY MINE · 4608878

    75.400 · $151.00 proposed

  19. inspectionF010B47
    AFFINITY MINE · 4608878

    103(i) Spot Inspections · 8.0 on-site hours

  20. violation5024548
    Affinity Preparation Plant · 4608879

    77.1606(c) · $151.00 proposed

  21. violation5024547
    Affinity Preparation Plant · 4608879

    77.1606(c) · $151.00 proposed

  22. violation5024546
    Affinity Preparation Plant · 4608879

    77.1606(c) · $151.00 proposed

  23. violation5092926
    AFFINITY MINE · 4608878

    75.403 · $151.00 proposed

  24. inspectionF010B46
    AFFINITY MINE · 4608878

    103(i) Spot Inspections · 7.0 on-site hours

  25. violation5024545
    Affinity Preparation Plant · 4608879

    77.202 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this controller in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON145.53Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS715,754Allocated from published county sales
ESTIMATED COAL REVENUE · USD104,163,696Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Affinity Mine4608878 · Raleigh, West Virginia699,401145.53715,754104,163,696County allocation estimate9.89% of eligible county production12 eligible mines / 12 sales respondents
Affinity Preparation Plant4608879 · Raleigh, West Virginia0145.53——Preparation plant12 eligible mines / 12 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.