← Metinvest B V

Metinvest B V safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord 6321991
    AFFINITY MINE · 4608878

    103(i) · 6.8 on-site hours reported

  2. Hoisting

    accidentRecord 220252160048
    AFFINITY MINE · 4608878

    Accident only

    Accident narrative

    Service hoist went down due to an input output card going bad. It caused the brakes to set the pump would run but not build pressure to release the brakes. replaced the card and had to have lake shore reprogram the over travel. finished work at 10:30 AM

  3. Permissible electric face equipment; maintenance.

    violationRecord 9841112
    AFFINITY MINE · 4608878

    30 CFR 75.503 · $165.00 proposed penalty

  4. Spot Inspections

    inspectionRecord 6322083
    AFFINITY MINE · 4608878

    103(i) · 10.0 on-site hours reported

  5. Maintenance of incombustible content of rock dust.

    violationRecord 5026134
    AFFINITY MINE · 4608878

    30 CFR 75.403 · $245.00 proposed penalty

  6. Maintenance of incombustible content of rock dust.

    violationRecord 5026133
    AFFINITY MINE · 4608878

    30 CFR 75.403 · $245.00 proposed penalty

  7. Spot Inspections

    inspectionRecord 6322428
    AFFINITY MINE · 4608878

    103(i) · 6.5 on-site hours reported

  8. Mine ventilation plan; submission and approval.

    violationRecord 5024667
    AFFINITY MINE · 4608878

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5026132
    AFFINITY MINE · 4608878

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  10. Other safeguards.

    violationRecord 5026131
    AFFINITY MINE · 4608878

    30 CFR 75.1403 · $151.00 proposed penalty

  11. Quantity and location of firefighting equipment.

    violationRecord 5026130
    AFFINITY MINE · 4608878

    30 CFR 75.1100-2(b) · $151.00 proposed penalty

  12. Health Technical Investigation

    inspectionRecord F009582
    Affinity Preparation Plant · 4608879

    10.5 on-site hours reported

  13. Mine ventilation plan; submission and approval.

    violationRecord 5024666
    AFFINITY MINE · 4608878

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  14. Machinery and equipment; operation and maintenance.

    violationRecord 5022002
    Affinity Preparation Plant · 4608879

    30 CFR 77.404(a) · Significant and substantial (S&S) · $366.00 proposed penalty

  15. Disorders (repeated trauma)

    accidentRecord 220252030018
    AFFINITY MINE · 4608878

    Occupatnal illness not deg 1-6

    Accident narrative

    EE was awarded 16.3 PPD hearing loss

  16. Spot Inspections

    inspectionRecord F007040
    AFFINITY MINE · 4608878

    103(i) · 8.0 on-site hours reported

  17. Permanent splicing of trailing cables.

    violationRecord 5026129
    AFFINITY MINE · 4608878

    30 CFR 75.604(a) · $193.00 proposed penalty

  18. Drill dust control at underground areas of underground mines.

    violationRecord 5026128
    AFFINITY MINE · 4608878

    30 CFR 72.630(b) · $193.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 5026127
    AFFINITY MINE · 4608878

    30 CFR 75.400 · $151.00 proposed penalty

  20. Electric equipment; examination, testing and maintenance.

    violationRecord 5026126
    AFFINITY MINE · 4608878

    30 CFR 75.512 · $151.00 proposed penalty

  21. Hoisting

    accidentRecord 220252030017
    AFFINITY MINE · 4608878

    Accident only

    Accident narrative

    input output card went down. The tips stuck in causing pressure to drop off accumulators. this caused the breaks to not release and fault the system out. The hoist was back operational at 10:10 PM on 07-18-2025

  22. Spot Inspections

    inspectionRecord 6322686
    AFFINITY MINE · 4608878

    103(i) · 4.0 on-site hours reported

  23. Impoundment Spot Inspection

    inspectionRecord F015507
    Affinity Preparation Plant · 4608879

    4.0 on-site hours reported

  24. Identification of circuit breakers.

    violationRecord 5026125
    AFFINITY MINE · 4608878

    30 CFR 75.904 · $177.00 proposed penalty

  25. Spot Inspection

    inspectionRecord 6321887
    Affinity Preparation Plant · 4608879

    4.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.