ACTIVE / CONTROLLER PORTFOLIO

Lucy M Taylor

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0132281

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
No. 1 Surface mine4609673 · Active2/8 quarters reportedGreenbrier, WVSurface · MSHA: Coal (Bituminous)2,6693,1970059.3
Peerless No. 1 Surface Mine4609524 · Active6/8 quarters reportedNicholas, WVSurface · MSHA: Coal (Bituminous)4,6236,2500066.0
Sewell Valley #24609519 · Active6/8 quarters reportedGreenbrier, WVSurface · MSHA: Coal (Bituminous)000023.0

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

0

0 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

—

0 of 0 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

148.25

15 inspections · 15 with hours

  1. 2025 Q123.00
  2. 2025 Q20.50
  3. 2025 Q35.00
  4. 2025 Q40.50
  5. 2026 Q122.50
  6. 2026 Q245.50
  7. 2026 Q351.25
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—00123.0
2025-Q200—0010.5
2025-Q300—0025.0
2025-Q400—0010.5
2026-Q100—00322.5
2026-Q200—00445.5
2026-Q300—00351.3
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

SectionViolationsS&S

No violation records in this period.

Safety activity

  1. inspectionF0291FE
    No. 1 Surface mine · 4609673

    Spot Inspection · 9.8 on-site hours

  2. inspectionF035D1E
    Peerless No. 1 Surface Mine · 4609524

    Regular Safety and Health Inspection · 41.0 on-site hours

  3. inspectionF035D18
    Peerless No. 1 Surface Mine · 4609524

    Spot Inspection · 0.5 on-site hours

  4. inspectionF007E2B
    Peerless No. 1 Surface Mine · 4609524

    Spot Inspection · 0.5 on-site hours

  5. inspectionF035D13
    No. 1 Surface mine · 4609673

    Regular Safety and Health Inspection · 24.5 on-site hours

  6. inspectionF035D03
    Sewell Valley #2 · 4609519

    Regular Safety and Health Inspection · 19.0 on-site hours

  7. inspectionF035D00
    No. 1 Surface mine · 4609673

    Spot Inspection · 1.5 on-site hours

  8. inspectionF01C71B
    Sewell Valley #2 · 4609519

    Spot Inspection · 1.0 on-site hours

  9. inspectionF01C719
    No. 1 Surface mine · 4609673

    Regular Safety and Health Inspection · 21.0 on-site hours

  10. inspectionF01C716
    No. 1 Surface mine · 4609673

    Spot Inspection · 0.5 on-site hours

  11. inspectionF01C709
    Peerless No. 1 Surface Mine · 4609524

    Spot Inspection · 0.5 on-site hours

  12. inspectionF01C6FB
    No. 1 Surface mine · 4609673

    Spot Inspection · 2.0 on-site hours

  13. inspectionF01C6F2
    Sewell Valley #2 · 4609519

    Spot Inspection · 3.0 on-site hours

  14. inspectionF00BF2D
    Peerless No. 1 Surface Mine · 4609524

    Spot Inspection · 0.5 on-site hours

  15. inspectionF00BF1C
    Peerless No. 1 Surface Mine · 4609524

    Regular Safety and Health Inspection · 23.0 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this controller in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Sewell Valley #24609519 · Location unavailable————No matching annual production record
Peerless No. 1 Surface Mine4609524 · Nicholas, West Virginia675———Below EIA sales-reporting threshold3 eligible mines / 3 sales respondents
No. 1 Surface mine4609673 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.