ACTIVE / CONTROLLER PORTFOLIO

Leonard A Rossi

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDC14786

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Banks Bank3608488 · Active6/8 quarters reportedCarbon, PAFacility · MSHA: Coal (Anthracite)017,2372074.8

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

2

0 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q41
  5. 2026 Q10
  6. 2026 Q21
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

302.00

2 of 2 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q3—
  4. 2025 Q4151
  5. 2026 Q1—
  6. 2026 Q2151
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

74.75

3 inspections · 3 with hours

  1. 2025 Q1—
  2. 2025 Q238.50
  3. 2025 Q3—
  4. 2025 Q419.50
  5. 2026 Q1—
  6. 2026 Q216.75
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q200—00138.5
2025-Q300—000—
2025-Q410151.0000119.5
2026-Q100—000—
2026-Q210151.0000116.8
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF029071
    Banks Bank · 3608488

    Regular Safety and Health Inspection · 16.8 on-site hours

  2. violation5154607
    Banks Bank · 3608488

    77.1102 · $151.00 proposed

  3. violation5155411
    Banks Bank · 3608488

    77.410(c) · $151.00 proposed

  4. inspectionF020433
    Banks Bank · 3608488

    Regular Safety and Health Inspection · 19.5 on-site hours

  5. inspectionF018158
    Banks Bank · 3608488

    Regular Safety and Health Inspection · 38.5 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS2,38515 rows · 1 receiving plants
HEAT CONTENT · BTU/LB7,555Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.42 / 64.18Separate averages over measured receipts
DELIVERED COST · USD/TON—0.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *9437,5560.4264.17—
2025-Q41,4427,5540.4264.18—
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2025-12EIA row 35693 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping43—Not published9,5000.4257.90SpotWCTruck
2025-12EIA row 35696 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping222—Not published9,0000.4259.50SpotWCTruck
2025-12EIA row 35697 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · MAZAIKA COAL Co.261—Not published6,0000.4269.20SpotWCTruck
2025-11EIA row 32674 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping44—Not published9,5000.4257.90SpotWCTruck
2025-11EIA row 32677 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping224—Not published9,0000.4259.50SpotWCTruck
2025-11EIA row 32678 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · MAZAIKA COAL Co.263—Not published6,0000.4269.20SpotWCTruck
2025-10EIA row 29732 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping162—Not published9,0000.4259.50SpotWCTruck
2025-10EIA row 29733 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · MAZAIKA COAL Co.191—Not published6,0000.4269.20SpotWCTruck
2025-10EIA row 29734 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping32—Not published9,5000.4257.90SpotWCTruck
2025-09EIA row 26675 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping33—Not published9,5000.4257.90SpotWCTruck
2025-09EIA row 26678 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping169—Not published9,0000.4259.50SpotWCTruck
2025-09EIA row 26679 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · MAZAIKA COAL Co.198—Not published6,0000.4269.20SpotWCTruck
2025-08EIA row 23592 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping45—Not published9,5000.4257.90SpotWCTruck
2025-08EIA row 23595 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · Nauss Landscaping229—Not published9,0000.4259.50SpotWCTruck
2025-08EIA row 23596 · finalBANKS BANK3608488Panther Creek Energy Facility50776 · PA · MAZAIKA COAL Co.269—Not published6,0000.4269.20SpotWCTruck
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED—0 of 0 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Banks Bank3608488 · Carbon, Pennsylvania0———Preparation plant1 eligible mines / 1 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.