ALL STATUSES / CONTROLLER PORTFOLIO

KTRV LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0182320

MINE PORTFOLIO

10 of 10 mines and facilities

2025-01-01 – 2026-10-13. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Carlos Surface1800769 · Temporarily Idled4/8 quarters reportedAllegany, MDSurface · MSHA: Coal (Bituminous)34,97613,8252028.5
Craighead Mine3610272 · AbandonedSomerset, PASurface · MSHA: Coal (Bituminous)——00—
Dupstadt3609810 · AbandonedSomerset, PASurface · MSHA: Coal (Bituminous)——00—
Heritage Strips1800788 · AbandonedGarrett, MDSurface · MSHA: Coal (Bituminous)——00—
Koontz Mine1800781 · AbandonedAllegany, MDSurface · MSHA: Coal (Bituminous)——00—
MAST MINE3610150 · Temporarily Idled3/8 quarters reportedSomerset, PASurface · MSHA: Coal (Bituminous)44,17760,0668052.5
Mt. Zion1800814 · AbandonedGarrett, MDSurface · MSHA: Coal (Bituminous)——00—
Refuse Disposal3606330 · AbandonedSomerset, PAFacility · MSHA: Coal (Bituminous)——00—
Saylor Mine3610306 · AbandonedSomerset, PASurface · MSHA: Coal (Bituminous)——001.5
Walker Mine1800776 · Temporarily Idled2/8 quarters reportedAllegany, MDSurface · MSHA: Coal (Bituminous)000011.0

LOCATION

Portfolio map

10 of 10 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

10

1 significant & substantial (S&S)

  1. 2025 Q13
  2. 2025 Q27
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

3,849.00

10 of 10 violations with amounts

  1. 2025 Q1615
  2. 2025 Q23,234
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

93.50

18 inspections · 18 with hours

  1. 2025 Q117.00
  2. 2025 Q261.25
  3. 2025 Q3—
  4. 2025 Q42.00
  5. 2026 Q15.50
  6. 2026 Q27.75
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q131615.0000417.0
2025-Q2703,234.0000661.3
2025-Q300—000—
2025-Q400—0032.0
2026-Q100—0025.5
2026-Q200—0037.8
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF02E8D5
    MAST MINE · 3610150

    Spot Inspection · 1.0 on-site hours

  2. inspectionF02E555
    Carlos Surface · 1800769

    Spot Inspection · 1.3 on-site hours

  3. inspectionF02E556
    Walker Mine · 1800776

    Spot Inspection · 5.5 on-site hours

  4. inspectionF02A507
    MAST MINE · 3610150

    Spot Inspection · 2.0 on-site hours

  5. inspectionF0262D7
    MAST MINE · 3610150

    Regular Safety and Health Inspection · 3.5 on-site hours

  6. inspectionF02A4FF
    Carlos Surface · 1800769

    Spot Inspection · 1.0 on-site hours

  7. inspectionF02A4FE
    Walker Mine · 1800776

    Spot Inspection · 1.0 on-site hours

  8. inspectionF000A51
    Carlos Surface · 1800769

    Regular Safety and Health Inspection · 0.0 on-site hours

  9. inspectionF006D76
    Walker Mine · 1800776

    Spot Inspection · 2.0 on-site hours

  10. inspectionF006D74
    Walker Mine · 1800776

    Spot Inspection · 1.5 on-site hours

  11. violation9208847
    MAST MINE · 3610150

    77.505 · $959.00 proposed

  12. violation9208846
    MAST MINE · 3610150

    77.1606(c) · $288.00 proposed

  13. violation9208496
    MAST MINE · 3610150

    77.904 · $465.00 proposed

  14. violation9208495
    MAST MINE · 3610150

    47.41(a)(1) · $151.00 proposed

  15. violation9208494
    MAST MINE · 3610150

    77.502 · $465.00 proposed

  16. inspectionF014DAF
    Carlos Surface · 1800769

    Spot Inspection · 1.8 on-site hours

  17. inspectionF0133AE
    MAST MINE · 3610150

    Regular Safety and Health Inspection · 36.8 on-site hours

  18. violation9589225
    Carlos Surface · 1800769

    77.502-2 · $755.00 proposed

  19. violation9589224
    Carlos Surface · 1800769

    77.410(a)(1) · $151.00 proposed

  20. inspectionF014DAE
    Carlos Surface · 1800769

    Regular Safety and Health Inspection · 18.5 on-site hours

  21. inspectionF0133AA
    Saylor Mine · 3610306

    Regular Safety and Health Inspection · 0.8 on-site hours

  22. inspectionF01339D
    MAST MINE · 3610150

    Verbal Hazard Complaint Inspections · 9.3 on-site hours

  23. violation9603326
    MAST MINE · 3610150

    77.1710(b) · S&S · $313.00 proposed

  24. violation9603316
    MAST MINE · 3610150

    77.1605(l) · $151.00 proposed

  25. violation9603315
    MAST MINE · 3610150

    77.1110 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS205,16818 rows · 1 receiving plants
HEAT CONTENT · BTU/LB12,682Weighted by reported tons
SULFUR / ASH · % BY WEIGHT1.54 / 11.98Separate averages over measured receipts
DELIVERED COST · USD/TON90.33100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *68,70612,6501.5512.4392.86
2025-Q457,59812,7311.5111.4191.43
2026-Q155,71012,6991.5511.9090.07
2026-Q216,89312,5971.6112.3280.62
2026-Q3 *6,26112,6601.3211.9081.02
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11945 · preliminaryMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.6,26181.0212,6601.3211.90ContractBITTruck
2026-06EIA row 10048 · preliminaryMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.6,62981.5512,7421.3412.00ContractBITTruck
2026-05EIA row 8206 · preliminaryMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.4,60880.3712,5581.5412.20ContractBITTruck
2026-04EIA row 6390 · preliminaryMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.5,65679.7412,4601.9912.80ContractBITTruck
2026-03EIA row 4580 · preliminaryMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.10,78079.9312,4891.7712.70ContractBITTruck
2026-02EIA row 2621 · preliminaryMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.7,26279.9212,4871.7812.60ContractBITTruck
2026-01EIA row 638 · preliminaryMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.5,94779.5612,4321.7012.80ContractBITTruck
2026-01EIA row 639 · preliminaryMAST MINE3610150Mt Storm3954 · WV · RITCHIE31,72197.8012,8691.3911.30SpotBITTruck
2025-12EIA row 34681 · finalMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.10,39979.8512,4761.6112.50ContractBITTruck
2025-12EIA row 34684 · finalMAST MINE3610150Mt Storm3954 · WV · RITCHIE15,19297.4112,8171.3810.00SpotBITTruck
2025-11EIA row 31696 · finalMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.3,90980.2112,5331.7213.00ContractBITTruck
2025-11EIA row 31699 · finalMAST MINE3610150Mt Storm3954 · WV · RITCHIE5,67695.5412,5711.5011.20SpotBITTruck
2025-10EIA row 28745 · finalMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.6,05881.4712,7291.9413.10ContractBITTruck
2025-10EIA row 28748 · finalMAST MINE3610150Mt Storm3954 · WV · RITCHIE16,36498.1812,9181.3711.10SpotBITTruck
2025-09EIA row 25681 · finalMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.8,88980.7012,6091.9413.10ContractBITTruck
2025-09EIA row 25685 · finalMAST MINE3610150Mt Storm3954 · WV · RITCHIE31,62496.2212,6611.4912.40SpotBITTruck
2025-08EIA row 22531 · finalMAST MINE3610150Mt Storm3954 · WV · POTOMAC-NORTH Inc.5,99680.4512,5711.9913.20ContractBITTruck
2025-08EIA row 22535 · finalMAST MINE3610150Mt Storm3954 · WV · RITCHIE22,19796.3012,6711.3612.00SpotBITTruck
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON112.16Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS224,679Allocated from published county sales
ESTIMATED COAL REVENUE · USD25,199,882Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%2 of 2 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Mast Mine3610150 · Somerset, Pennsylvania146,124134.29138,40018,585,743County allocation estimate13.29% of eligible county production7 eligible mines / 7 sales respondents
Carlos Surface1800769 · Allegany, Maryland89,50076.6686,2796,614,139County allocation estimate12.47% of eligible county production5 eligible mines / 5 sales respondents
Walker Mine1800776 · Location unavailable————No matching annual production record
Koontz Mine1800781 · Location unavailable————No matching annual production record
Heritage Strips1800788 · Location unavailable————No matching annual production record
Mt. Zion1800814 · Location unavailable————No matching annual production record
Refuse Disposal3606330 · Location unavailable————No matching annual production record
Dupstadt3609810 · Location unavailable————No matching annual production record
Craighead Mine3610272 · Location unavailable————No matching annual production record
Saylor Mine3610306 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.