Kennedy King safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Machinery and equipment; operation and maintenance.
#1 · 151879330 CFR 75.1725(a) · Significant and substantial (S&S) · $549.00 proposed penalty
Accumulation of combustible materials.
#1 · 151879330 CFR 75.400 · $267.00 proposed penalty
Mechanical equipment guards.
#1 · 151879330 CFR 75.1722(a) · Significant and substantial (S&S) · $818.00 proposed penalty
Drill dust control at underground areas of underground mines.
#1 · 151879330 CFR 72.630(b) · Significant and substantial (S&S) · $818.00 proposed penalty
Spot Inspection
#1 · 15187935.0 on-site hours reported
Accumulation of combustible materials.
#1 · 151879330 CFR 75.400 · $336.00 proposed penalty
Accumulation of combustible materials.
#1 · 151879330 CFR 75.400 · $336.00 proposed penalty
Condition and examination of firefighting equipment.
#1 · 151879330 CFR 75.1100-3 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
#1 · 151879330 CFR 75.370(a)(1) · $193.00 proposed penalty
Permanent splicing of trailing cables.
#1 · 151879330 CFR 75.604(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Permanent splicing of trailing cables.
#1 · 151879330 CFR 75.604(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Respirable dust standards.
#1 · 151879330 CFR 70.100(a)(2) · Significant and substantial (S&S) · $366.00 proposed penalty
Accumulation of combustible materials.
#1 · 151879330 CFR 75.400 · $313.00 proposed penalty
Accumulation of combustible materials.
#1 · 151879330 CFR 75.400 · $313.00 proposed penalty
Mechanical equipment guards.
#1 · 151879330 CFR 77.400(c) · Significant and substantial (S&S) · $959.00 proposed penalty
Preshift examination at fixed intervals.
#1 · 151879330 CFR 75.360(g) · $288.00 proposed penalty
Smoking; prohibition.
#1 · 151879330 CFR 75.1702 · $288.00 proposed penalty
Quarterly sampling; designated areas.
#1 · 151879330 CFR 70.209(a) · $193.00 proposed penalty
Quarterly sampling; mechanized mining units.
#1 · 151879330 CFR 70.208(a)(1) · $193.00 proposed penalty
Regular Safety and Health Inspection
#1 · 1518793102.5 on-site hours reported
Spot Inspection
#1 · 15187939.0 on-site hours reported
Spot Inspection
#1 · 151879310.0 on-site hours reported
Spot Inspection
#1 · 15187934.5 on-site hours reported
Condition and examination of firefighting equipment.
#1 · 151879330 CFR 75.1100-3 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
#1 · 151879330 CFR 50.30(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.