Coal production
0reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Mahanoy City Stripping3610210 · Active6/8 quarters reported | Schuylkill, PASurface · MSHA: Coal (Anthracite) | 0 | 399 | 9 | 1 | 116.0 |
| St. Nicholas Cogeneration Plant3607979 · Active6/8 quarters reported | Schuylkill, PAFacility · MSHA: Coal (Anthracite) | 0 | 33,781 | 6 | 4 | 115.3 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 2 mines listed under this controller were checked; 2 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 5,458 | 0.00 | 10 | 2/2 mines reporting |
| 2025 Q2 | 0 | 5,293 | 0.00 | 11 | 2/2 mines reporting |
| 2025 Q3 | 0 | 5,832 | 0.00 | 10 | 2/2 mines reporting |
| 2025 Q4 | 0 | 6,097 | 0.00 | 10 | 2/2 mines reporting |
| 2026 Q1 | 0 | 5,691 | 0.00 | 10 | 2/2 mines reporting |
| 2026 Q2 | 0 | 5,809 | 0.00 | 10 | 2/2 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
3 significant & substantial (S&S)
0 records classified as fatality
14 of 15 violations with amounts
12 inspections · 12 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 2 | 0 | 302.00 | 0 | 0 | 1 | 28.5 |
| 2025-Q2 | 4 | 1 | 604.00 | 1 | 0 | 2 | 59.0 |
| 2025-Q3 | 1 | 0 | 151.00 | 1 | 0 | 1 | 6.0 |
| 2025-Q4 | 2 | 0 | 302.00 | 0 | 0 | 1 | 27.5 |
| 2026-Q1 | 1 | 0 | 151.00 | 1 | 0 | 4 | 53.5 |
| 2026-Q2 | 3 | 2 | 360.00 | 0 | 0 | 1 | 29.0 |
| 2026-Q3 | 2 | 0 | 302.00 | 2 | 0 | 2 | 27.8 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
47.44(b) · $151.00 proposed
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
Employee was getting off of the loader and slipped and fell
Spot Inspection · 0.0 on-site hours
71.206(a) · $151.00 proposed
DISORDERS (REPEATED TRAUMA) · OCCUPATNAL ILLNESS NOT DEG 1-6
Noise exposure from work related and non work related sources. All employees are provided access to hearing protection.
Regular Safety and Health Inspection · 27.8 on-site hours
71.209(a) · $151.00 proposed
77.1605(l) · S&S · $209.00 proposed
Regular Safety and Health Inspection · 29.0 on-site hours
77.206(a) · S&S
Non-Fatal Accident Investigation · 6.0 on-site hours
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
EE went to step out of a loader and the chain broke off of the chain step. EE fell about a foot and a half in which EE's knees got stuck under the loader. Ambulance was called and had taken EE to the emergency room to be checked over.
77.207 · $151.00 proposed
Regular Safety and Health Inspection · 46.5 on-site hours
Compliance Follow-up Inspection · 0.0 on-site hours
Spot Inspection · 1.0 on-site hours
77.207 · $151.00 proposed
77.1200 · $151.00 proposed
Regular Safety and Health Inspection · 27.5 on-site hours
HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY
The employee was loading a scrap metal plate into a loader bucket. While the plate was being loaded, it slid out of the bucket and cut the lower left leg.
Spot Inspection · 6.0 on-site hours
47.44(b) · $151.00 proposed
Regular Safety and Health Inspection · 24.0 on-site hours
77.1110 · $151.00 proposed
77.410(c) · $151.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 190,465 | 3,828 | 0.44 | 60.80 | — | |
| 2025-Q4 | 321,998 | 3,971 | 0.42 | 59.61 | — | |
| 2026-Q1 | 364,805 | 3,531 | 0.35 | 61.39 | — | |
| 2026-Q2 | 323,876 | 3,626 | 0.35 | 62.96 | — | |
| 2026-Q3 * | 126,166 | 3,416 | 0.32 | 63.40 | — |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 12685 · preliminary | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 126,166 | —Not published | 3,416 | 0.32 | 63.40 | ContractWC | Tram/conveyor / Truck |
| 2026-06EIA row 10742 · preliminary | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 106,567 | —Not published | 3,746 | 0.34 | 61.50 | ContractWC | Tram/conveyor / Truck |
| 2026-05EIA row 8863 · preliminary | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 119,338 | —Not published | 3,507 | 0.29 | 63.90 | ContractWC | Tram/conveyor / Truck |
| 2026-04EIA row 7075 · preliminary | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 97,971 | —Not published | 3,639 | 0.43 | 63.40 | ContractWC | Tram/conveyor / Truck |
| 2026-03EIA row 5247 · preliminary | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 134,887 | —Not published | 3,427 | 0.32 | 60.80 | ContractWC | Tram/conveyor / Truck |
| 2026-02EIA row 3357 · preliminary | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 112,155 | —Not published | 3,513 | 0.36 | 62.40 | ContractWC | Tram/conveyor / Truck |
| 2026-01EIA row 1387 · preliminary | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 117,763 | —Not published | 3,666 | 0.39 | 61.10 | ContractWC | Tram/conveyor / Truck |
| 2025-12EIA row 35804 · final | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 121,592 | —Not published | 4,082 | 0.48 | 58.80 | ContractWC | Tram/conveyor / Truck |
| 2025-11EIA row 32786 · final | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 110,450 | —Not published | 3,912 | 0.38 | 60.60 | ContractWC | Tram/conveyor / Truck |
| 2025-10EIA row 29850 · final | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 89,956 | —Not published | 3,893 | 0.40 | 59.50 | ContractWC | Tram/conveyor / Truck |
| 2025-09EIA row 26790 · final | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 77,561 | —Not published | 3,917 | 0.61 | 60.80 | ContractWC | Tram/conveyor / Truck |
| 2025-08EIA row 23702 · final | ST NICHOLAS COGENERATION PLANT3607979 | St Nicholas Cogen Project54634 · PA · SCHUYLKILL ENERGY RESOURCES INC | 112,904 | —Not published | 3,767 | 0.33 | 60.80 | ContractWC | Tram/conveyor / Truck |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. 2 current coal members have no matching annual record; their coverage is unknown. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| St. Nicholas Cogeneration Plant3607979 · Location unavailable | — | — | — | — | No matching annual production record |
| Mahanoy City Stripping3610210 · Location unavailable | — | — | — | — | No matching annual production record |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.