John Mitch Potter safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Loading and haulage equipment; operation.
Delbarton Preparation Plant · 460564930 CFR 77.1607(cc) · $151.00 proposed penalty
Accumulations of combustible materials.
Delbarton Preparation Plant · 460564930 CFR 77.1104 · $1,219.00 proposed penalty
Mechanical equipment guards.
Delbarton Preparation Plant · 460564930 CFR 77.400(d) · $193.00 proposed penalty
Travelways at surface installations.
Delbarton Preparation Plant · 460564930 CFR 77.205(d) · Significant and substantial (S&S) · $642.00 proposed penalty
Travelways at surface installations.
Delbarton Preparation Plant · 460564930 CFR 77.205(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Examination and maintenance of firefighting equipment.
Delbarton Preparation Plant · 460564930 CFR 77.1110 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Holden #22 Surface · 460898430 CFR 77.1606(c) · $432.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Holden #22 Surface · 460898430 CFR 77.1606(c) · $432.00 proposed penalty
Other safeguards.
Lower War Eagle · 460931930 CFR 75.1403 · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lower War Eagle · 460931930 CFR 75.512 · $226.00 proposed penalty
Other safeguards.
Lower War Eagle · 460931930 CFR 75.1403 · $245.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lower War Eagle · 460931930 CFR 75.512 · $3,736.00 proposed penalty
Regular Safety and Health Inspection
Road Fork Deep Mine · 46096482.0 on-site hours reported
Mechanical equipment guards.
Delbarton Preparation Plant · 460564930 CFR 77.400(d) · $151.00 proposed penalty
Requirement for container labels.
Delbarton Preparation Plant · 460564930 CFR 47.41(a) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Delbarton Preparation Plant · 460564930 CFR 77.1606(c) · $432.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Lower War Eagle · 460931930 CFR 75.1731(a) · $151.00 proposed penalty
Illumination.
Delbarton Preparation Plant · 460564930 CFR 77.207 · $165.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Powellton #1 Mine · 460921730 CFR 75.512 · $245.00 proposed penalty
Power wires and cables; insulation and protection.
Powellton #1 Mine · 460921730 CFR 75.517 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Regular Safety and Health Inspection
Eagle Energy Mine No.1 · 460942541.5 on-site hours reported
Loading and haulage equipment; installations.
Delbarton Preparation Plant · 460564930 CFR 77.1605(k) · $151.00 proposed penalty
Permanent splicing of trailing cables.
Powellton #1 Mine · 460921730 CFR 75.604(b) · $165.00 proposed penalty
Methane monitors.
Powellton #1 Mine · 460921730 CFR 75.342(a)(4) · $151.00 proposed penalty
Accumulation of combustible materials.
Powellton #1 Mine · 460921730 CFR 75.400 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.