John Mitch Potter safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Impoundment Spot Inspection
Holden No 22 Preparation Plant · 46059091.8 on-site hours reported
Power wires and cables; insulation and protection.
Lower War Eagle · 460931930 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Permanent splicing of trailing cables.
Lower War Eagle · 460931930 CFR 75.604(b) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Accumulation of combustible materials.
Lower War Eagle · 460931930 CFR 75.400 · $313.00 proposed penalty
Permissible electric face equipment; maintenance.
Lower War Eagle · 460931930 CFR 75.503 · $151.00 proposed penalty
Ventilation controls.
Lower War Eagle · 460931930 CFR 75.333(h) · $151.00 proposed penalty
Spot Inspections
Lower War Eagle · 4609319103(i) · 6.0 on-site hours reported
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
Lower War Eagle · 460931930 CFR 75.1600-2(e) · $151.00 proposed penalty
Automatic fire warning devices; actions and response.
Lower War Eagle · 460931930 CFR 75.1103-5(h)(1) · $165.00 proposed penalty
Drill dust control at underground areas of underground mines.
Eagle Energy Mine No.1 · 460942530 CFR 72.630(b) · $151.00 proposed penalty
Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation requirements.
Eagle Energy Mine No.1 · 460942530 CFR 75.1710-1(d) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Eagle Energy Mine No.1 · 460942530 CFR 75.503 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Delbarton Preparation Plant · 460564930 CFR 77.1606(c) · $267.00 proposed penalty
Loading and haulage equipment; installations.
Delbarton Preparation Plant · 460564930 CFR 77.1605(d) · $151.00 proposed penalty
Accumulations of combustible materials.
Delbarton Preparation Plant · 460564930 CFR 77.1104 · $267.00 proposed penalty
Loading and haulage equipment; installations.
Delbarton Preparation Plant · 460564930 CFR 77.1605(a) · $267.00 proposed penalty
Machinery and equipment; operation and maintenance.
Delbarton Preparation Plant · 460564930 CFR 77.404(a) · $592.00 proposed penalty
Loading and haulage equipment; installations.
Delbarton Preparation Plant · 460564930 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Delbarton Preparation Plant · 460564930 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Delbarton Preparation Plant · 460564930 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Delbarton Preparation Plant · 460564930 CFR 77.1605(d) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Loading and haulage equipment; installations.
Delbarton Preparation Plant · 460564930 CFR 77.1605(d) · $151.00 proposed penalty
Automatic emergency-parking brakes.
Powellton #1 Mine · 460921730 CFR 75.523-3(c)(2) · $209.00 proposed penalty
Permissible electric face equipment; maintenance.
Powellton #1 Mine · 460921730 CFR 75.503 · $151.00 proposed penalty
Surface installations; general.
Delbarton Preparation Plant · 460564930 CFR 77.200 · Significant and substantial (S&S) · $818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.