John Mitch Potter safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Loading and haulage equipment; inspection and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1606(c) · $504.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1606(c) · Significant and substantial (S&S) · $151.00 proposed penalty
Loading and haulage equipment; installations.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1605(d) · $151.00 proposed penalty
Accumulations of combustible materials.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1104 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
TWIN BRANCH NO 1 SURFACE · 460907530 CFR 77.1606(c) · $697.00 proposed penalty
Mine ventilation plan; submission and approval.
Powellton #1 Mine · 460921730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $504.00 proposed penalty
Other safeguards.
Powellton #1 Mine · 460921730 CFR 75.1403 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lower War Eagle · 460931930 CFR 75.512 · $177.00 proposed penalty
Non-Injury Accident Investigation
Powellton #1 Mine · 460921719.5 on-site hours reported
Weekly examination.
Powellton #1 Mine · 460921730 CFR 75.364(b)(4) · Significant and substantial (S&S) · $9,004.00 proposed penalty
Construction and repair of seals.
Powellton #1 Mine · 460921730 CFR 75.337(h) · Significant and substantial (S&S) · $9,004.00 proposed penalty
Violation — cited standard not reported
Powellton #1 Mine · 4609217Mine ventilation plan; submission and approval.
Powellton #1 Mine · 460921730 CFR 75.370(a)(1) · $1,818.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Powellton #1 Mine · 460921730 CFR 75.512 · $151.00 proposed penalty
Drill holes; guarding.
Middle Fork Surface · 460964530 CFR 77.1011 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Middle Fork Surface · 460964530 CFR 77.1606(c) · $151.00 proposed penalty
Spot Inspections
Lower War Eagle · 4609319103(i) · 7.5 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
Lower War Eagle · 460931930 CFR 75.1731(a) · $177.00 proposed penalty
Spot Inspection
DEEPWATER SURFACE MINE · 46091053.0 on-site hours reported
Spot Inspection
Eagle Energy Mine No.1 · 46094251.3 on-site hours reported
Verbal Hazard Complaint Inspections
Eagle Energy Mine No.1 · 46094258.3 on-site hours reported
Permanent splicing of trailing cables.
Eagle Energy Mine No.1 · 460942530 CFR 75.604(b) · $151.00 proposed penalty
On-shift examination.
Eagle Energy Mine No.1 · 460942530 CFR 75.362(a)(2) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Eagle Energy Mine No.1 · 460942530 CFR 75.503 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Eagle Energy Mine No.1 · 460942530 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.