← John Mitch Potter

John Mitch Potter safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Loading and haulage equipment; installations.

    violationRecord 5091405
    Holden #22 Surface · 4608984

    30 CFR 77.1605(b) · $165.00 proposed penalty

  2. Accumulations of combustible materials.

    violationRecord 5091404
    Holden #22 Surface · 4608984

    30 CFR 77.1104 · Significant and substantial (S&S) · $959.00 proposed penalty

  3. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5091403
    Holden #22 Surface · 4608984

    30 CFR 77.1606(c) · $1,037.00 proposed penalty

  4. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5091402
    Holden #22 Surface · 4608984

    30 CFR 77.1606(c) · $1,037.00 proposed penalty

  5. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5091401
    Holden #22 Surface · 4608984

    30 CFR 77.1606(c) · $1,550.00 proposed penalty

  6. Loading and haulage equipment; installations.

    violationRecord 9599419
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.1605(e) · $313.00 proposed penalty

  7. Examination and maintenance of firefighting equipment.

    violationRecord 9599418
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.1110 · $151.00 proposed penalty

  8. Travelways at surface installations.

    violationRecord 5025522
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.205(c) · $151.00 proposed penalty

  9. Electric equipment; examination, testing, and maintenance.

    violationRecord 5025521
    Deep Water Prep Plant P-2 · 4609162

    30 CFR 77.502 · $151.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9834766
    Powellton #1 Mine · 4609217

    30 CFR 75.400 · $151.00 proposed penalty

  11. Permissible electric face equipment; maintenance.

    violationRecord 9834765
    Powellton #1 Mine · 4609217

    30 CFR 75.503 · $151.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9834764
    Powellton #1 Mine · 4609217

    30 CFR 75.400 · $151.00 proposed penalty

  13. Electric equipment; examination, testing, and maintenance.

    violationRecord 9599417
    Glenco Load-Out · 4609218

    30 CFR 77.502 · Significant and substantial (S&S) · $697.00 proposed penalty

  14. Machinery and equipment; operation and maintenance.

    violationRecord 9839261
    Lower War Eagle · 4609319

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  15. Permanent splicing of trailing cables.

    violationRecord 9839260
    Lower War Eagle · 4609319

    30 CFR 75.604(b) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  16. Inspection of fire suppression devices.

    violationRecord 9839259
    Lower War Eagle · 4609319

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  17. Mechanical equipment guards.

    violationRecord 9838999
    Holden #22 Surface · 4608984

    30 CFR 77.400(d) · $165.00 proposed penalty

  18. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9838998
    Holden #22 Surface · 4608984

    30 CFR 77.1606(c) · $959.00 proposed penalty

  19. Permanent splicing of trailing cables.

    violationRecord 9834763
    Powellton #1 Mine · 4609217

    30 CFR 75.604(b) · $209.00 proposed penalty

  20. Automatic emergency-parking brakes.

    violationRecord 9834762
    Powellton #1 Mine · 4609217

    30 CFR 75.523-3(c)(2) · $151.00 proposed penalty

  21. Roof control plan.

    violationRecord 9839258
    Lower War Eagle · 4609319

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  22. Machinery and equipment; operation and maintenance.

    violationRecord 9839257
    Lower War Eagle · 4609319

    30 CFR 75.1725(a) · $209.00 proposed penalty

  23. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 9839256
    Lower War Eagle · 4609319

    30 CFR 75.701 · $245.00 proposed penalty

  24. Fall of face/rib/pillar/side/highwall

    accidentRecord 220251110030
    Lower War Eagle · 4609319

    Days away from work only

    Accident narrative

    EE was turning S/C into the right side dump. EE misjudged the turn and hit the corner of a coal rib with the canopy, which resulted in a piece of coal dislodging and coming in contact with the EE, striking the EE on the right ankle, resulting in a fracture.

  25. Spot Inspections

    inspectionRecord 7048961
    Lower War Eagle · 4609319

    103(i) · 7.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.