← John Mitch Potter

John Mitch Potter safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Approval of other fire suppression devices.

    violationRecord 5023452
    LITTLE EAGLE MINE NO 1 · 4608560

    30 CFR 75.1107-13(g) · $151.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5023451
    LITTLE EAGLE MINE NO 1 · 4608560

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 5023450
    LITTLE EAGLE MINE NO 1 · 4608560

    30 CFR 75.512 · $151.00 proposed penalty

  4. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9839676
    Delbarton Preparation Plant · 4605649

    30 CFR 77.1606(c) · $151.00 proposed penalty

  5. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 9839675
    Delbarton Preparation Plant · 4605649

    30 CFR 77.701 · $151.00 proposed penalty

  6. Loading and haulage equipment; installations.

    violationRecord 5096181
    Holden #22 Surface · 4608984

    30 CFR 77.1605(d) · $267.00 proposed penalty

  7. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5096180
    Holden #22 Surface · 4608984

    30 CFR 77.1606(c) · $592.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5130740
    Powellton #1 Mine · 4609217

    30 CFR 75.400 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5130739
    Powellton #1 Mine · 4609217

    30 CFR 75.1731(b) · $151.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5130738
    Powellton #1 Mine · 4609217

    30 CFR 75.1731(a) · $245.00 proposed penalty

  11. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 9837191
    Lower War Eagle · 4609319

    30 CFR 75.1600-2(e) · $151.00 proposed penalty

  12. Grounding metallic sheaths, armors, and conduits enclosing power conductors.

    violationRecord 9837190
    Lower War Eagle · 4609319

    30 CFR 75.700 · $151.00 proposed penalty

  13. Verbal Hazard Complaint Inspections

    inspectionRecord F013386
    DEEPWATER SURFACE MINE · 4609105

    3.0 on-site hours reported

  14. Mechanical equipment guards.

    violationRecord 9839674
    Delbarton Preparation Plant · 4605649

    30 CFR 77.400(a) · $165.00 proposed penalty

  15. Mechanical equipment guards.

    violationRecord 9839673
    Delbarton Preparation Plant · 4605649

    30 CFR 77.400(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  16. Identification of circuit breakers.

    violationRecord 9839672
    Delbarton Preparation Plant · 4605649

    30 CFR 77.904 · $366.00 proposed penalty

  17. Loading and haulage equipment; installations.

    violationRecord 5096179
    Holden #22 Surface · 4608984

    30 CFR 77.1605(k) · $288.00 proposed penalty

  18. Automatic fire warning devices; actions and response.

    violationRecord 5130737
    Powellton #1 Mine · 4609217

    30 CFR 75.1103-5(a) · $151.00 proposed penalty

  19. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5130736
    Powellton #1 Mine · 4609217

    30 CFR 75.1731(a) · $245.00 proposed penalty

  20. Clamping of trailing cables to equipment.

    violationRecord 5098286
    Lower War Eagle · 4609319

    30 CFR 75.605 · $151.00 proposed penalty

  21. Permanent splicing of trailing cables.

    violationRecord 5098285
    Lower War Eagle · 4609319

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  22. Roof control plan.

    violationRecord 5098284
    Lower War Eagle · 4609319

    30 CFR 75.220(a)(1) · $1,037.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5098283
    Lower War Eagle · 4609319

    30 CFR 75.400 · $432.00 proposed penalty

  24. Regular Safety and Health Inspection

    inspectionRecord F0106EA
    Delbarton Preparation Plant · 4605649

    106.8 on-site hours reported

  25. Spot Inspections

    inspectionRecord F00856A
    Lower War Eagle · 4609319

    103(i) · 10.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.